Laserfiche WebLink
EXHIBIT 1A <br />32, All work or on -site activity during wn•nurmsI working hours n,13 be coordinated in advance with Owner, <br />33. At no time will Contractor perform activities on the Project without the proper insurance in force. <br />34. No radios or other audio devices romdlosvcd, <br />35. Failure to perform work in a manner consistent with the above stnted Raise of the Site may result In Inanedible work stoppage by Owner, <br />Owner shall have no liability for any costs or expenses Incurred by Canb'nelar or any subcontractors (or Tenant) in connection with or as a <br />result of such work stoppage. <br />36. The Rules of the Site may be amended or revised at any time to fit the situation at the time, The amended or revised Rates of the Site shall <br />became effectiva upon delivery to Contractor or publication by posting at die project site, whichever is earlier. <br />37. General contractor and subcontractors' vehiclesparking must be in areas designated by the Building Manager at the Contractor's expense. <br />Acknowledged and Agreed <br />By, <br />Date; <br />MI III Orle C'dinre Dr— 476• ofSanrn,lsn Lease •6. Gxhibit D <br />• ' 1 I <br />L� <br />