Laserfiche WebLink
32, All work or on -site activity during non-nomml working hours will be coordinated in advance with Owner. <br />33, At no time will Contractor perform activities on the Project wilhout the proper insurance in force. <br />34. No radios or other audio devices are allowed. <br />35. Failure to perform work in a manner consistcnl with the above staled Rules of the Site may result in immediate work stoppage by Owner, <br />Owner shall have no liability for oily costs or expenses incurred by Contractor or any subcontractors (or Tenant) in connection with or as a <br />result of such work stoppage. <br />36. The Rules of the Site may be amended or revised at any time to fit the situation at the time, The amended or revised Rules of the Site shall <br />become effective upon delivery to Contractor or publication byposting at the project site, whichever is earlier. <br />37. General contractor and subcontractors' vehicles parking must be in areas designated by the Building Manager at the Contractor's expense. <br />Acknowledged and Agreed <br />By: <br />Date: <br />861 WCirir ClWrr Dr—Ciq' njSanea.-lan Lease -6- Gxhibir D <br />