SANTA ANA - WORK CENTER
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA - WORK CENTER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 4:05:10 PM
Creation date
5/22/2019 1:07:19 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA - WORK CENTER
Contract #
A-2019-070-01
Agency
COMMUNITY DEVELOPMENT
Council Approval Date
5/7/2019
Expiration Date
6/30/2022
Destruction Year
2027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I5. Doors to all work areas, including stairwells and mechanical and electrical closets, will remain closed at all time. Propping doors open is <br />expressly prohibited <br />16. All Contractor and subcontractor personnel, materials, [Dols and equipnhent are to enter and exit the Building through the service elevator <br />Only. Owner may at any time initiate a check in/check out system, or a bodge system, fur all people and matmial in the Building and die <br />Contractor will agree to cooperate with any such system. <br />17. Before ordering material or doing work which is dependent upon proper size or installation, the Contractor shall field verify all dimensions <br />for accessibility with building conditions, and shall be responsible for same. <br />18. Con tractor shall not permitted any identifying signage or advertising within the Project or Building. <br />19. During construction, Contractor shall maintain supervisory personnel on the site at all times. Such personnel shall be fully authorized to <br />coordinate, respond for and authorize Contractor's work as necessary so as to enable all work to proceed in a timely and well -ordered <br />fashion. Should Contractor perform work which would cause or require Owner to provide personnel to be present or otherwise perrarn <br />any work, Contractor shall reimburse Owner for tie expense of quell personnel. <br />20, Contractor shall be responsible for the protection of its work and the area adjacent to his work. <br />21 • Contractor will ensure that all stairwells, mechanical rooms, electrical and telephone closets, etc, accessed by Contractor or subcontractors <br />in conjunction with Contractor's work, will be cleaned and fiee of debris nightly. <br />22, Public areas adjacent to premises where Contractor's work is being performed shall remain free of debris and materials at all times. <br />23. Contractor shall be responsible for all his actions on site as well as those of its subcontractors, and shall indemnify, defend and hold <br />harmless the Owner and the other Owner Parties from and against any and all claims, losses, or damages, threatened or incurred, arising <br />from the actions or omissions of Contractor or Its subcontractors. <br />24. If keys are required by contractors, they must be checked out From the Property Management Office. No key will be distributed If proper <br />identification is not provided. <br />25. No cutting or patching of Owner's premises or installations, or those of any Building occupant, shall be permitted without the prior written <br />consent of Owner. Request for permission to do cutting shall include explicit details and description of work and shall not under any <br />circumstances diminish die structural integrity of die Building or the integrity of any of components or systems. The work is to be done <br />only with (he explicit written permission of the Property Manager, and only on an "Off -Hours" basis. Such work is to be done only under <br />the direct supervision of a competent member of the Contractor staff. Any such area is to be promptly repaired and returned to a fully <br />functioning, complete, and clean condition. <br />26. All work is to be done to a minimum standard of quality as required by the Base Building Drawings and Specifications (to be made <br />available by Owner upon request). It Is the responsibility of the Contractor to be rally knowledgeable of the Base Building Drawings and <br />Specifications. <br />27. All Life Satety Systems for the Building are to be maintained, and all or the Tenant's work is to be properly interfaced with and connected <br />to the Base Building systems as required by Laws, or by Building operation. All work is to be done in such a way as to protect all Base <br />Building operations and warranties. Any required disconnection of life safety devices should be "foreseen" and the Property Management <br />Office must be notified at least 24 hours in advance. Costs for false fire slams due m contractors' or subcontractors' negligence will be <br />billed to end paid by the Conractur. All lit'e-safety systems testing must be perfumed on on "after-hours" basis and coordinated with die <br />Building Manager. <br />28. When work is performed by Contractor or subcontractor, charges will apply for additional services performed by Owner which may <br />include, but are not necessarily limited to the following: <br />A - overtime or after-hours elevator usage <br />B - utility usage for construction activities beyond standard power and water used in connection with general office uses <br />C - extra and continuous clean-up of elevaturs and public spaces as required due to construction activity; Contractor to provide dnc <br />usual protection of existing improvements, mud exercise care and good sense <br />D - extended or aller-hours use of the loading dock <br />29. In addition to cleaning requirements described above, Contractor shall, in preparation for subsmnliai completion or occupancy or the <br />project by Tenant, perfornh final cleaning or Contractnr's Work. <br />iD. Wile', Contractor takes over an area fFnm the Owner, belure commencing wok Contractor shall nacerluin Ihot the area is in a sate and <br />sanitary condition, and maintain the urea as necessary (at its sole cost mid expense) in a s;de and s:oitary condition and to a standard <br />','acting all applicable Imvs and regulations. <br />71. Owner requires job progress meetings. The Contractor will attend with a representative authorized to speak and act on the Contractor's <br />behalf. Additionally. the Contractor shall notify the Ownerorschcduled job progress meetings. <br />S01 It Civie Center Or- Cig' al'Sa,wrrtart Lease -i. ExhibitD <br />