My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALIFORNIA, STATE OF EMPLOYMENT DEVELOPMENT DEPARTMENT (2)
Clerk
>
Contracts / Agreements
>
C
>
CALIFORNIA, STATE OF
>
CALIFORNIA, STATE OF EMPLOYMENT DEVELOPMENT DEPARTMENT (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2020 8:39:57 AM
Creation date
5/29/2019 10:06:04 AM
Metadata
Fields
Template:
Contracts
Company Name
CALIFORNIA, STATE OF EMPLOYMENT DEVELOPMENT DEPARTMENT
Contract #
A-2019-072
Agency
COMMUNITY DEVELOPMENT
Council Approval Date
5/7/2019
Expiration Date
6/30/2023
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 1 — AUTHORITY AND POLICY REQUIREMENTS <br />C. The Division of the State Architect (DSA) is charged with the responsibility of <br />ensuring compliance with the above standards. <br />D. If at any time during the Design, Construction Document Review, or Construction <br />Inspection processes, a conflict arises between the State and local authorities, the <br />Lessor/architect will compile all pertinent information and present the situation to the <br />RESD Space Planner. <br />E. The DSA has delegated a component of the access compliance responsibility to <br />RESD for leased facilities. Conforming to DSA delegation, RESD is requiring the <br />Lessor to ensure compliance by utilizingone of the two procedures defined in this <br />document. Refer`to division 3 (below) for specific requirements and procedures. <br />F. Public right -„of- way access is;required for all State leased facilit1d& ,11f the existing <br />conditions do not meet the required codes and regulations, the design. professional <br />(Lessor's architeot) must demonstrate and document a diligent effort to request that <br />the authority (having control) over the public right- of- way, makes the necessary <br />modifications to secure right-of-way access. All correspondence shall be <br />documented`and provided to the RESD-Space Planner for the project file, <br />End of Authority and Policy Requirements <br />-x3 (Rew3/19/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.