15. Doors to all work areas, Including stairwells and mechanical and electrical closets, will remain closed at all tithe, Propping doors open is <br />expressly prohibited, <br />16. All Contractor and subcontractor personnel, materials, tools and equipment are to enter and exit the Building through the service elevator <br />only. Owner may at any time initiate a check in/check out system, or a badge system, for all people and material in the Building and rite <br />Contractor will agree to cooperate with any such system. <br />17. Before ordering material or doing work which is dependent upon proper size or installation, the Contractor shall field verify at dimensions <br />for accessibility with building conditions, and shall be responsible for same. <br />19. Con tractor shal I not permitted any identifying sign age or advertising within the Projector Building. <br />19. During construction, Contractor shall maintain supervisory personnel on rite site at all times. Such personnel shall be fully authorized to <br />coordinate, respond for and authorize Contractor's work as necessary so as to enable oil work to proceed in a timely and well -ordered <br />fashion. Should Contractor perform work which would cause or require Owner to provide personnel to be present or otherwise perform <br />any wotik, Contractor shall reimburse Owner for the expense of such personnel. <br />20, Contractor shall be responsible for the protection of its work and the area adjacent to his work. <br />21. Contractor will ensure that all stairwells, mechanical rooms, electrical and telephone closets, etc, accessed by Contractor or subcontractors <br />In conjunction with Contractor's work, will be cleaned and free of debris nightly. <br />22, Public areas ndjacent to premises where Contractor's work is being performed shall remain flee of debris and materials at all times. <br />23. Contractor shall be responsible for all his actions on site as well as those of its subcontractors, and shall indemnify, defend and hold <br />harmless the Owner and the other Owner Parties from and against any and all claims, losses, or damages, threatened or incurred, arising <br />from the actions or omissions of Contractor or Its subcontractors. <br />24. If keys are required by contractors, they must be checked out from rite Property Management Office. No key will be distributed if proper <br />identification is not provided. <br />25. No cutting or patching of Owner's premises or installations, or those of any Building occupant, shall be permitted wldamn the prior written <br />consent of Owner. Request for permission to do cutting shall Include explicit details and description of work and shall not under any <br />circumstances diminish the structural integrity of the Building or the Integrity of any of components or systems. The work is to be done <br />only willt the explicit written permission of the Property Manager, and only on an "Off -Hours" basis. Such work is to be done only under <br />the direct supervision of a competent member or the Contractor start. Any such area is to be promptly repaired and returned to a fully <br />functioning, complete, land clean condition. <br />26. All work is to be done to a minimum standard of quality as required by the Base Building Drawings and Specifications (to be made <br />available by Owner upon request). It Is the responsibility ordie Contractor to be fully knowledgeable of [lie Base Building Drawings and <br />Specifications. <br />27. All Life Safety Systems for the Building are to be maintained, and all of the Tenant's work is to be properly interfaced with mid connected <br />to the Base Building systems as required by Laws, or by Building operation. All work is to be done in such a way as to protect all Base <br />Building operations and warranties. Any required disconnection of life safety devices should be "foreseen" and the Property Management <br />Office must be notified at least 24 hours In advance. Costs for false fire slants due to contractors' or subcontractors' negligence will be <br />billed to and paid by the Contractor. All life -safety systems testing must be performed on an "after-hours" basis and coordinated with die <br />Building Manager. <br />28. When work is perfurmed by Contractor or subcontractor, charges will apply for additional services performed by Owner which may <br />include, but are not necessarily limited to the following: <br />A - overtime or after-hours elevator usage <br />B - utility usage for construction activities beyond standard power and water used in connection with general office uses <br />C - extra and continuous cleanup of elevators and public spaces as required due to construction activity; Contractor to provide the <br />usual protection of existing Improvements, and exercise care and good sense <br />D - extended or after-hours use of the loading dock <br />29. In addition to cleaning requirements described above, Contractor shall, in preparation for substantial completion or occupancy or the <br />project by Tenant, perfimn final cleaning of Contractor's Work. <br />30, When Contractor takes over an area from the Oivner, before commencing wurk Contractor shall ascertain that the area is in a safe and <br />sanfmry condition, end maintain the Area as necessary (it Its sole cost and expense) in it safe and sanitary condition and to a standard <br />meeting all applicable Imps and regulations, <br />31. Owner requires job progress meetings. Tim Conductor will attend with a representative authorized to speak and Oct on the Contractor's <br />behalf. Additionally, the Contractor shall notify Hie Owner of scheduled job progress meetings. <br />xnr fvCureCenterDr—C(q ofSouat.4on Leore -5- Exhibit D <br />