Laserfiche WebLink
32. All work or on -site activity during non -normal working hours will be coordinated in advance with Owner. <br />33. At no time will Contractor perform activities on the Project without the proper insurnnce In force. <br />34. No radios or other audio devices are allowed. <br />35. Failure to perform work in a manner consistent with the above stated Rules of the Site may result in Immediate work stoppage by Owner. <br />Owner shall have no liability for any costs or expenses incurred by Contractor or any subcontractors (or Tenant) io connection with or as a <br />result of such work stoppage. <br />36. The Rules orthe Site may be amended or revised at any time to fit the situation at the time, The amended or revised Rules of the Site shall <br />become effective upon delivery to Contractor or publication by posting at the project site, whichever is earlier. <br />37. General contractor and subcontractors' vehicles parking must be in areas designated by the BuildingManager at the Contractor's expense. <br />Acknowledged and Agreed <br />By: <br />Date: <br />801 IVCDrr Cmnrmr Dr-Ciq• ofSmwn Aar Loam -6- Gxhibil D <br />