My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75D - PH- MAIN PLACE TRANSFORMATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
06/04/2019
>
75D - PH- MAIN PLACE TRANSFORMATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 7:32:33 PM
Creation date
5/30/2019 5:10:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75D
Date
6/4/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
702
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ER No. 2018-72, AA <br />Transformation Project <br />May 13, 2019 <br />Page 3 <br />No. 2018-04, DA No. 2018-02, & TPM No. 2018-01, — MainPlace <br />evaluate the potential Impacts associated with the rehabilitation and redevelopment of the site as a <br />mixed -use commercial center with 1,600,000 square feet of retail space, 1,500,000 square feet of <br />office space, and 1,200 hotel rooms. The 1983 EIR was certified by the City of Santa Ana <br />Redevelopment Agency in 1983. In 1987, the majority of the Fashion Square was transformed into <br />what is currently MainPlace Mall. <br />In 1996, the City of Santa Ana prepared Addendum (ER No. 96-033) to the 1983 EIR to evaluate a <br />proposed retail expansion of the project site. While the proposed retail expansion was never fully <br />implemented, in 2000 the City relied on the 1996 Addendum and 1983 EIR to approve a site plan <br />and vesting tentative parcel map. These entitlements permitted up to 1,509,256 square feet of retail, <br />1,500,000 square feet of office space, and 400 hotel rooms. A final parcel map consistent with the <br />2000 entitlements was approved and recorded in October 2002. However, the improvements related <br />to the parcel map and 2000 entitlements were never implemented. <br />MainPlace Mall is today comprised of 1,130,000 square feet of commercial and retail uses within an <br />enclosed two- and three-story mall building. There are 4,882 parking spaces in six surface parking <br />lots and three onsite parking structures. Table 2: Previous and Current Entitlements, below, <br />illustrates the site's existing development capacity. <br />Table 2: Previous and Current Entitlements <br />Land Use <br />1983 EIR <br />Net Year 2000 <br />Change <br />2000 Parcel <br />Map <br />Commercial <br />1,600,000 sq. ft, <br />-90,745 sq. ft. <br />1,509,255 sq. ft. <br />Office <br />1,500,000 sq. ft. <br />0 <br />1,500,000 sq. ft. <br />Hotel <br />1,200 rooms <br />-800 rooms <br />400 rooms <br />Residential <br />(None) <br />(None) <br />(None) <br />Project Description <br />The applicant is proposing modify the current entitlements listed in Table 2 to establish a new <br />Specific Plan zoning designation on the site. The proposed Specific Plan, SP-4, is implementing a <br />mitigation measure (No. 6.1-1) from the 1983 EIR and would facilitate phased redevelopment and <br />revitalization of the mall into a mixed -use urban village with commercial, office, hotel, and <br />residential uses. The proposed, revised entitlements and net changes are outlined in Table 3: <br />Proposed Entitlements and Net Change on the following page. <br />75D-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.