Laserfiche WebLink
ER No. 2018-72, AA No. 2018-04, nA No. 2018-02, & TPM No. 2018-01, — MainPlace <br />Transformation Project <br />May 13, 2019 <br />Page 12 <br />The 1983 EIR considers the environmental impacts relating to land use, soils and geology, <br />hydrology, biological resources, archaeology, traffic and circulation, noise, air quality, aesthetics <br />(including shade/shadow, solar glare, and illumination), housing/population, John Wayne Airport, <br />public services and utilities (including natural gas, electricity, communications, water, sewer, solid <br />waste, police protection, and fire protection), energy conservation, irreversible environmental <br />changes, and growth inducement. It determined that the original, 1983 entitlements would not <br />result in any potentially significant impacts relating to soil and geology, hydrology, archaeology, <br />noise, air quality, housing/population, John Wayne Airport, natural gas, electricity, <br />communications, water, sewer, and solid waste. <br />In 1996, the City prepared Addendum (ER 96-033) to the Environmental Impact Report for <br />Proposed MainPlace/Santa Ana Expansion to the 1983 EIR to evaluate a proposed expansion of <br />the original, 1983 entitlements' commercial uses. The 1996 Addendum evaluated each topical <br />issue addressed in the 1983 EIR and included updated air quality and traffic analyses. The 1996 <br />Addendum concluded that no subsequent environmental impact report was required under CEQA <br />because the proposed retail expansion did not result in new or substantially more severe significant <br />impacts than were disclosed in the 1983 EIR. While the 1996 proposed retail expansion was never <br />fully implemented, in 2000 the City relied on the 1996 Addendum and 1983 EIR to approve a site <br />plan and vesting tentative parcel map. These entitlements permitted up to 1,509,255 square feet <br />of retail, 1,500,000 square feet of office space, and 400 hotel rooms. A final parcel map consistent <br />with the 2000 entitlements was approved and recorded in October 2002. However, the <br />Improvements related to the parcel map and 2000 entitlements were never implemented. <br />Mitigation Measures and Addendum Conclusions <br />The City has prepared an updated Mitigation Monitoring and Reporting Program (MMRP) for the <br />MainPlace Specific Plan. The original MMRP contained 19 mitigation measures, of which 8 are <br />ongoing and applicable and 11 are no longer applicable because they have been completed or <br />have been superseded by changes to various laws or codes. <br />An updated MMRP has been prepared to for the MainPlace Transformation Project Specific Plan. <br />The mitigation measures from the 1983 EIR include measures that are not applicable to the <br />proposed MainPlace Mall Transformation Project, require modifications to reflect the current status <br />of development at the Project site, or have been implemented and do not need to be carried <br />forward. The 1996 Addendum did not identify any additional mitigation measures. The 1983 EIR <br />mitigation measures are listed in the updated MMRP after each topical section. Where any <br />clarifications to the 1983 EIR mitigation measures were necessary, strikeout text is used in the <br />updated MMRP to show deleted wording and underline text is used to indicate wording that has <br />been added. <br />75D-28 <br />