Laserfiche WebLink
Local Guidelines for Implementing the <br />California Environmental Ouality Act (2019) B4ITIAL STUDY <br />Table 1 <br />VMT Impact Thresholds <br />Methods <br />Project Threshold <br />Cumulative Threshold <br />• Consistency check with <br />NA <br />A significant impact would occur if <br />the Southern California <br />the project is determined to be <br />Association of <br />inconsistent with the RTP/SCS. <br />Governments (SCAG) <br />Regional Transportation <br />Plan/Sustainable <br />Communities Strategy <br />(RTP/SCS). <br />- Is the proposed <br />project within the <br />growth projections in <br />the RTP/SCS? <br />Land Use Projects <br />• Transit Priority Area <br />Presumed less than <br />Project presumption applies under <br />(TPA) screening. <br />significant VMT impact <br />cumulative conditions as long as <br />for projects located in <br />project is consistent with SCAG <br />TPAs. <br />RTP/SCS. <br />• Low VMT area screening. <br />Presumed less than <br />Project presumption applies under <br />significant VMT impact <br />cumulative conditions as long as <br />for projects located in <br />project is consistent with SCAG <br />low VMT generating <br />RTP/SCS. <br />model traffic analysis <br />zones (TAZs). These <br />TAZs generate total daily <br />VMT/SP that is 15% less <br />than the baseline level <br />for the County. <br />• Project type screening. <br />Local serving retail <br />Project presumption applies under <br />projects (Per OPR's <br />cumulative conditions as long as <br />Technical Advisory less <br />project is consistent with SCAG <br />than 50,000 square feet) <br />RTP/SCS. <br />and neighborhood <br />schools are presumed to <br />have a less than <br />significant VMT impact. <br />Projects that generate <br />less than 110 daily trips <br />do not require VMT <br />analysis. <br />• VMT analysis using <br />A significant impact <br />A significant impact would occur if <br />OCTAM forecast of total <br />would occur if the <br />the project is determined to be <br />2019 City of Santa Ana Local Guidelines 5-8 ®Best Best & Krieger LLP <br />75D-69 <br />