My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-040 - Mainplace Mall Transformation
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2019
>
2019-040 - Mainplace Mall Transformation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2019 10:01:52 AM
Creation date
6/20/2019 8:39:53 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2019-040
Date
6/4/2019
Destruction Year
P
Document Relationships
2019-041 - Approving Tentative Parcel Map No. 2018-01
(Amended By)
Path:
\Resolutions\CITY COUNCIL\2011 -\2019
NS-2967 - Approving Development Agreement No. 2018-02 Between City of Santa Ana and Mainplace ShoppingTown, LLC for Mainplace Mall Transformation Project
(Amended By)
Path:
\Ordinances\2011 - 2020 (NS-2813 - NS-3000)\2019 (NS-2963 - NS-2978)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2935
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water Quality Management Plan (WQMP) <br />Mainplace Mall Specific Plan <br />IV.2. Site Design and Drainage <br />Describe site design and drainage including <br />• A narrative of site design practices utilized or rationale for not using practices; <br />• A narrative of how site is designed to allow BMPs to be incorporated to the MEP <br />• A table of DMA characteristics and list of LID BMPs proposed in each DMA. <br />• Reference to the WQMP "BMP Exhibit" <br />• Calculation of Design Capture Volume (DCV) for each drainage area. <br />• A listing of GIS coordinates for LID and Treatment Control BMPs. <br />Refer to Section 2.4.2 in the Technical Guidance Document (TGD). <br />DMA <br />Area <br />DCV <br />Q <br />LID Methodology <br />Number <br />(AC) <br />(CF) <br />(CFS) <br />Parcel 1 <br />5.44 <br />6,500 <br />0.58 <br />Underground infiltration with hydrodynamic separator <br />pretreatment. <br />Parcel 2 <br />1.63 <br />2,000 <br />0.17 <br />Underground infiltration with hydrodynamic separator <br />pretreatment. <br />Parcel 3 <br />1.91 <br />2,300 <br />0.20 <br />Underground infiltration with hydrodynamic separator <br />pretreatment. <br />Parcel 4 <br />1.76 <br />2,100 <br />0.19 <br />Underground infiltration with hydrodynamic separator <br />pretreatment. <br />Parcel 5 <br />2.83 <br />3,400 <br />0.30 <br />Underground infiltration with hydrodynamic separator <br />pretreatment. <br />Parcel 6 <br />22.9 <br />27,500 <br />2.46 <br />Underground infiltration with hydrodynamic separator <br />pretreatment. <br />Parcel 7 <br />4.05 <br />4,900 <br />0.43 <br />Underground infiltration with hydrodynamic separator <br />pretreatment. <br />Parcel 8 <br />3.08 <br />3,700 <br />0.33 <br />Underground infiltration with hydrodynamic separator <br />pretreatment. <br />Parcel 9 <br />1.97 <br />2,400 <br />0.21 <br />Underground infiltration with hydrodynamic separator <br />pretreatment. <br />Parce110 <br />1.66 <br />2,000 <br />0.18 <br />Underground infiltration with hydrodynamic separator <br />pretreatment. <br />NAP <br />2.94 <br />3,500 <br />0.32 <br />Underground infiltration with hydrodynamic separator <br />pretreatment. <br />Since this project is still in a forward planning stage, pecise BMP types and locations <br />ae ubknown at this time. Where feasible, infiltration will be utilized. Where <br />infiltration is infeasible, biofiltration will be utilized. <br />Centennial Section IV <br />Conceptual Specific Plan WQMP Page 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.