My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-040 - Mainplace Mall Transformation
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2019
>
2019-040 - Mainplace Mall Transformation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2019 10:01:52 AM
Creation date
6/20/2019 8:39:53 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2019-040
Date
6/4/2019
Destruction Year
P
Document Relationships
2019-041 - Approving Tentative Parcel Map No. 2018-01
(Amended By)
Path:
\Resolutions\CITY COUNCIL\2011 -\2019
NS-2967 - Approving Development Agreement No. 2018-02 Between City of Santa Ana and Mainplace ShoppingTown, LLC for Mainplace Mall Transformation Project
(Amended By)
Path:
\Ordinances\2011 - 2020 (NS-2813 - NS-3000)\2019 (NS-2963 - NS-2978)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2935
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water Quality Management Plan (WQMP) <br />Mainplace Mall Specific Plan <br />Project Performance Criteria <br />If HCOC exists, list applicable <br />No HCOCs. The project 2-year runoff volume is not increased by <br />hydromodification control <br />more than 5% and the project time of concentration is not <br />performance criteria (Section <br />reduced by more than 5%. <br />7.II-2.4.2.2 in MWQMP) <br />• Retain, on -site, (infiltrate, harvest and use, or <br />evapotranspire) stormwater runoff as feasible up to the <br />Design Capture Volume, and <br />List applicable LID . Recover (i.e., draw down) the storage volume as soon as <br />performance criteria (Section <br />possible after a storm event and <br />7.II-2.4.3 from MWQMP) <br />• Biotreat, on -site, additional runoff, as feasible, up to 80 <br />percent average annual capture efficiency (cumulative, <br />retention plus biotreatment), <br />If it is not feasible to meet LID performance criteria through <br />retention and/or biotreatment provided on -site or at a sub- <br />regional/regional scale, then treatment control BMPs shall be <br />List applicable treatment <br />provided on -site or offsite prior to discharge to waters of the US. <br />control BMP performance <br />Sizing of treatment control BMP(s) shall be based on either the <br />criteria (Section 7.II-3.2.2 from <br />unmet volume after claiming applicable water quality credits. If <br />MWQMP) treatment control BMPs can treat all of the remaining unmet <br />volume and have a medium to high effectiveness for reducing <br />the primary POCs, the project is considered to be in compliance. <br />C = (0.75xo.9+.15)=0.825 <br />D=0.80" <br />P_@IOiTs <br />Calculate LID design storm <br />V=117,500 Cubic Feet <br />capture volume for Project. <br />After 50% reduction (see below for credits): <br />V=58,750 Cubic Feet <br />This volume is for the entire Specific Plan area. <br />Centennial Section IV <br />Conceptual Specific Plan WQMP Page 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.