Laserfiche WebLink
MainPlace Mall Transformation Project 12126.001 <br />Laboratory Testing — Soils samples were collected from the hollow -stem soil <br />borings for geotechnical laboratory testing. Laboratory tests were performed on <br />representative samples to determine the index properties and engineering <br />characteristics of the subsurface soils. <br />Engineering Analysis — Geotechnical analysis was performed on the collected <br />data to develop conclusions and preliminary recommendations for the planned <br />development. <br />Report Preparation — This report presents findings of our field and laboratory <br />explorations, design considerations, and preliminary recommendations currently <br />planned for the site. <br />3 <br />!oto <br />jo <br />Leighton <br />