My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-040 - Mainplace Mall Transformation
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2019
>
2019-040 - Mainplace Mall Transformation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2019 10:01:52 AM
Creation date
6/20/2019 8:39:53 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2019-040
Date
6/4/2019
Destruction Year
P
Document Relationships
2019-041 - Approving Tentative Parcel Map No. 2018-01
(Amended By)
Path:
\Resolutions\CITY COUNCIL\2011 -\2019
NS-2967 - Approving Development Agreement No. 2018-02 Between City of Santa Ana and Mainplace ShoppingTown, LLC for Mainplace Mall Transformation Project
(Amended By)
Path:
\Ordinances\2011 - 2020 (NS-2813 - NS-3000)\2019 (NS-2963 - NS-2978)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2935
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MainPlace Mall Transformation Project 12126.001 <br />between 15 and 20 feet bgs. The infiltration test zone in LB-6 was determined at <br />depths between 11.5 and 16.5 feet bgs. <br />Infiltration test well were installed inside the boreholes after completion of the <br />drilling. Infiltration test well consisted of a 5-foot section of 2-inch-diameter <br />perforated PVC pipe installed in the borehole within the test zone and a solid <br />section of 2-inch diameter PVC pipe was installed above the perforated section <br />and extended to the top of the well. The annulus of each borehole within the <br />testing zone was filled with clean sand (#3 Monterey Sand). The infiltration test <br />was performed in consistence with the procedures outlined in the Technical <br />Guidance Document of the Orange County Water Quality Management Plan. The <br />test results are presented in Appendix D, Infiltration Test Data. <br />2.4 Geotechnical Laboratory Testing <br />The following tests were performed on the soil samples collected during our field <br />investigations on August 20, 2018, and October 29 and 30, 2018: <br />• In -situ Moisture Content and Dry Density (ASTM D2216 and ASTM D2937) <br />• Particle size (sieve analysis ASTM D6913 and ASTM D1140) <br />• Expansion Index (ASTM D4829) <br />• Modified Proctor Compaction (ASTM D1557) <br />• R-Value DOT CA Test 301 <br />• Corrosivity CTM 422, 417, and 643 (chloride and sulfate content, minimum <br />resistivity, and pH) <br />Consolidation with time rate settlement (ASTM D2435, and ASTM D4546) <br />Direct Shear Test (consolidated drained), (ASTM D3080) <br />Results of the laboratory tests are presented in Appendix C, Laboratory Testing <br />Data. <br />!oto <br />jo <br />Leighton <br />
The URL can be used to link to this page
Your browser does not support the video tag.