Laserfiche WebLink
DYODS TM <br />Design Your Own Detention System <br />w���uTCwu:� <br />CONSTRUCTION PRODUCTS INC. <br />Project Summary <br />Date: 4/24/2019 <br />Project Name: Mainplace Parcel 8 <br />City / County: Santa Ana <br />State: California <br />Designed By: Jason Marechal <br />Company: Kimley-Horn <br />Telephone: (714) 786-6183 <br />Corrugated Metal Pipe Calculator <br />Storage Volume Required (cf): <br />Limiting Width (ft): <br />Effective Depth Below Asphalt (ft): <br />Solid or Perforated Pipe: <br />Shape Or Diameter: <br />Spacing between Barrels (ft): <br />Stone Width Around Perimeter of System (ft) <br />Depth A: Porous Stone Above Pipe (in): <br />Depth C: Porous Stone Below Pipe (in): <br />Stone Porosity (0 to 40%): <br />ISvstem Sizina <br />Pipe Storage: <br />Porous Stone Storage: <br />Total Storage Provided: <br />Number of Barrels: <br />Length Per Barrel: <br />Rectangular Footprint (W x Q <br />CONTECH Materials <br />Total CMP Footage: <br />Approximate Total Pieces: <br />Approximate Coupling Bands: <br />Approximate Truckloads: <br />Construction Quantities** <br />Total Excavation: <br />Porous Stone Backfill For Storage <br />Backfill to Grade Excluding Stone: <br />'Construction quantities are appr <br />CMP DETENTION SYSTEMS <br />For design assistance, drawings, <br />and pricing send completed worksheet to: <br />dyods@contech-cpi.com <br />3,700 <br />25.00 <br />10.00 <br />Solid <br />48 <br />2.00 <br />0 <br />12 <br />0 <br />40 <br />Use Custom Layout <br />3,720 cf <br />0 cf <br />3,720 cf <br />4 barrels <br />74.00 ft <br />22. ft x 74. ft <br />296 ft <br />16 pcs <br />12 bands <br />2 trucks <br />Finished Grade <br />Pavement Elevation <br />Backfill to Grade c w N <br />Enter Information in Q - <br />Blue Cells - <br />12.57 ft2 Pipe Area <br />at right) for lavout adiustment <br />100.5% Of Required Storage <br />603 cy <br />0 cy Stone <br />465 cy Fill <br />imate and should be verified <br />final <br />Spacing <br />Q <br />w <br />Diameter S tracing 6 <br />' � w <br />Custom Layout <br />To adjust layout, enter desired barrel length in the light blue boxes below. <br />Excess Footage = 0 <br />Barrel 12 <br />Barrel 11 <br />Barrel10 <br />Barrel <br />Barrel <br />Barrel <br />Barrel <br />Barrel <br />Barrel <br />Barrel <br />Barrel <br />Barrel 1 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />74 <br />74 <br />74 <br />74 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />74 <br />lip <br />74 <br />74 <br />74 <br />0 20 40 60 80 <br />© 2007 CONTECH Stormwater Solutions <br />