My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-040 - Mainplace Mall Transformation
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2019
>
2019-040 - Mainplace Mall Transformation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2019 10:01:52 AM
Creation date
6/20/2019 8:39:53 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2019-040
Date
6/4/2019
Destruction Year
P
Document Relationships
2019-041 - Approving Tentative Parcel Map No. 2018-01
(Amended By)
Path:
\Resolutions\CITY COUNCIL\2011 -\2019
NS-2967 - Approving Development Agreement No. 2018-02 Between City of Santa Ana and Mainplace ShoppingTown, LLC for Mainplace Mall Transformation Project
(Amended By)
Path:
\Ordinances\2011 - 2020 (NS-2813 - NS-3000)\2019 (NS-2963 - NS-2978)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2935
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DYODS TM <br />Design Your Own Detention System <br />CONSTRUCTION PRODUCTS INC. <br />Project Summary <br />Date: 4/24/2019 <br />Project Name: Mainplace Parcel 9 <br />City / County: Santa Ana <br />State: California <br />Designed By: Jason Marechal <br />Company: Kimley-Horn <br />Telephone: (714) 786-6183 <br />Corrugated Metal Pipe Calculator <br />Storage Volume Required (cf): <br />Limiting Width (ft): <br />Effective Depth Below Asphalt (ft): <br />Solid or Perforated Pipe: <br />Shape Or Diameter: <br />Spacing between Barrels (ft): <br />Stone Width Around Perimeter of System (ft) <br />Depth A: Porous Stone Above Pipe (in): <br />Depth C: Porous Stone Below Pipe (in): <br />Stone Porosity (0 to 40%): <br />System Sizing <br />Pipe Storage: <br />Porous Stone Storage: <br />Total Storage Provided: <br />Number of Barrels: <br />Length Per Barrel: <br />Rectangular Footprint (W x Q: <br />CONTECH Materials <br />Total CMP Footage: <br />Approximate Total Pieces: <br />Approximate Coupling Bands: <br />Approximate Truckloads: <br />Construction Quantities** <br />Total Excavation: <br />Porous Stone Backfill For Storage <br />Backfill to Grade Excluding Stone: <br />'Construction quantities are appr <br />w \\I%uV1Ewu® <br />Ic <br />:.►: <br />CMP DETENTION SYSTEMS <br />For design assistance, drawings, <br />and pricing send completed worksheet to: <br />dyods@contech-cpi.com <br />2,400 <br />25.00 <br />10.00 <br />Solid <br />48 <br />2.00 <br />0 <br />12 <br />0 <br />40 <br />Use Custom Layout <br />2,413 cf <br />0 cf <br />2,413 cf <br />4 barrels <br />48.00 ft <br />22. ft x 48. ft <br />192 ft <br />8 pcs <br />4 bands <br />1 trucks <br />Finished Grade <br />Pavement Elevation <br />Backfill to Grade c w N <br />Enter Information in Q - <br />Blue Cells --- <br />' w <br />Spacing Diameter S tracing <br />ff w <br />12.57 ft2 Pipe Area 4 <br />i <br />at right) for layout adjustment Custom Layout <br />To adjust layout, enter desired barrel length in the light blue boxes below. <br />Excess Footage = 0 <br />100.5% Of Required Storage <br />Barrel12 0 <br />Barrel 11 0 <br />Barrel10 0 <br />Barrel 0 <br />Barrel <br />0 <br />Barrel <br />0 <br />Barrel <br />0 <br />Barrel <br />0 <br />Barrel <br />48 <br />Barrel <br />48 <br />392 cy Barrel 2 48 <br />0 cy Stone Barrel 1 48 <br />303 cy Fill <br />imate and should be verified upon final <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />g <br />48 <br />0 10 20 30 40 50 60 <br />© 2007 CONTECH Stormwater Solutions <br />
The URL can be used to link to this page
Your browser does not support the video tag.