Laserfiche WebLink
RESOLUTION 2019-XXX 3.92% <br />r <br />ppnpncpn �- <br />REVENUE <br />FY 18-19 <br />FY 19-20 <br />ACCOUNT <br />DEPARTMENT/MISCELLANEOUS FEE OR SERVICE <br />UNIT <br />FEES <br />FEES <br />SECTION IX <br />PLANNING & BUILDING AGENCY <br />31603 <br />12) <br />Temporary power -construction: <br />For services supplying a temporary power pole, <br />Each <br />67.20 <br />69.83 <br />pedestal or piggyback <br />For a system of distribution and utilization of poles <br />Each Pole <br />12.76 <br />13.26 <br />fortemporary construction power, each pole <br />51603 <br />13) <br />Temporary construction lighting: <br />500 lamps or less <br />5.75 <br />5.98 <br />Over 500 lamps <br />10.04 <br />10.43 <br />51603 <br />14) <br />Temporary services: <br />At the time of application for temporary power, the owner <br />shall post a $1,000 cash or cashier's check conforming to the <br />Santa Ana Municipal Code Section 8-1768 for each service <br />meter. This deposit shall be released upon request after the <br />Certificate of Completion or Certificate of Occupancy Is issued. <br />Temporary Electrical Service, Prior to Approval <br />Each Meter <br />244.09 <br />253.66 <br />Or Occupancy (30 Days) <br />Temporary work with service, each meter <br />Each Meter <br />33.99 <br />35.32 <br />51603 <br />15) <br />Lighting standards: <br />With one (1) fixture each <br />Each <br />12.76 <br />13.26 <br />Each additional fixture on the same standard <br />Each <br />3.69 <br />3.83 <br />51603 <br />16) <br />Time clock or photo electric cell, each <br />Each <br />10.04 <br />10.43 <br />31603 <br />17) <br />Radiant ceiling heat per room <br />Per Room <br />12.76 <br />13.26 <br />51603 <br />18) <br />Power apparatus: generators, motors, transformers, <br />rectifiers, synchronous converters, capacitors, <br />Industrial heating, cooking or baking equipment, and <br />other apparatus as follows: <br />(Ratings - horsepower (HP), kilowatts (KW), and <br />Kilovolt amps (KVA)) <br />Up to and including 1 HP, KW, KVA each <br />Each <br />5.20 <br />5.40 <br />Over 1 and not over 10 HP, KW, KVA each <br />Each <br />13.43 <br />13.96 <br />LJ <br />L -i <br />55 <br />