My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRESENTATION - 75A (2)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
06/04/2019
>
PRESENTATION - 75A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 4:35:11 PM
Creation date
6/21/2019 2:53:04 PM
Metadata
Fields
Template:
City Clerk
Item #
75A
Date
6/4/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 2019-XXX <br />3.92% <br />PROPOSED <br />REVENUE <br />FY 18-19 <br />FY 19-20 <br />ACCOUNT <br />DEPARTMENT/MISCELLANEOUS FEE OR SERVICE UNIT <br />FEES <br />FEES <br />SECTION IX <br />PLANNING & BUILDING AGENCY <br />Over 10 and not over 50 HP, KW, KVA each Each <br />27.22 <br />28.29 <br />Over 50 and not over 100 HP, KW, KVA each Each <br />58.31 <br />60.60 <br />Over 100 and not over 500 HP, KW, KVA each Each <br />77.67 <br />80.71 <br />Over 500 HP, KW, KVA each Each <br />96.78 <br />100.57 <br />51603 <br />19) Demolition, per project Per Project <br />37.69 <br />39.17 <br />51603 <br />20) Inspections outside of normal business hours (four hour Per Hour <br />96.78 <br />100.57 <br />minimum charge for Holidays, Saturday or Sunday <br />Inspections) <br />51603 <br />21) Re -inspection fee assessed under applicable provisions Per Hour <br />96.78 <br />100.57 <br />of the Building Code <br />51603 <br />22) Inspections for which no fee is specifically Per Hour <br />96.78 <br />100.57 <br />Indicated (minimum charge- one (1) hour) <br />53601 <br />23) Additional plan review required by changes, additions, or Per Hour <br />96.78 <br />100.57 <br />revisions to approved plans (minimum charge - one (1) hour) <br />ELECTRICAL PLAN CHECK FEES <br />Whenever electrical plans are required by the Building <br />Official, plan check fees shall be 65%of the electrical <br />permit fee and shall be paid at the time of submitting plans. <br />51604 <br />MECHANICAL CODE <br />Any person desiring a permit required by the Mechanical Each Permit <br />46.27 <br />48.08 <br />Code shall, at the time of filing an application, pay a fee <br />of $46.27. There is no minimum fee for the Issuance of a <br />permit for single family residences and duplexes. The <br />minimum total fee for issuance of a permit for all other uses <br />shall be $75.61. <br />75.61 <br />78.57 <br />FEE SCHEDULE <br />51604 <br />1) For the Installation or relocation of each forced -air or Each <br />33.76 <br />35.08 <br />gravity -type furnace or burner, including ducts and <br />vents attached to such appliance, up to and including <br />100,000 8TU/h <br />51604 <br />2) For the Installation or relocation of each forced -air Each <br />48.21 <br />50.10 <br />or gravity -type furnace or burner, including ducts <br />and vents attached to such appliance over 100,000 BTU/h <br />51604 <br />3) For the installation or relocation of each boiler, compressor, Each <br />58.31 <br />60.60 <br />condensing unit or heat pump up to and including five <br />horsepower, or each absorption system to and including <br />100,000 BTU/h <br />m <br />
The URL can be used to link to this page
Your browser does not support the video tag.