My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT LANDSCAPE MAINTENANCE SVCS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
07/02/2019
>
25F - AGMT LANDSCAPE MAINTENANCE SVCS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2019 5:18:30 PM
Creation date
6/27/2019 5:06:06 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
7/2/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Contract Supervisors and Lead workers <br />a. Provide an English-speaking Contract supervisor and Lead workers who are <br />fully trained and knowledgeable in all aspects of these requirements: <br />b. Equipped with a working, fully -charged, capable of taking and sending photos <br />and emails, cellular phone, to enable immediate contact with Project Manager <br />and/or designee. <br />c. Contract Supervisor and Lead workers must demonstrate skills including, but not <br />limited to the following: <br />1. Basic principles of supervision, directing, planning, controlling, training and <br />appropriate safety procedures. <br />2. Ability to safely direct the work of crews engaged In maintenance activities in <br />a high vehicle and pedestrian traffic area. <br />3. Ability to effectively communicate in verbal and written form in order to solve <br />daily problems. <br />4. Contract Supervisor must have the authority to sign documents and/or effect <br />changes to the work being performed. <br />5. Contract Supervisor must be able to tour the Area with a Project Manager or <br />his/her designee on an as -needed basis for the purpose of determining <br />compliance with these specifications or to discuss required work. <br />6. Contract Supervisor is responsible for ensuring the crews are accomplishing <br />the scheduled work per the specifications. <br />4. Uniform and Safety Vests <br />a. Pay foc and bear the maintenance cost of uniforms for all employees working <br />on the project. The uniforms must bear Contractor's company name. <br />b. The uniform must be wom as a complete unit and be fitted properly. The <br />uniform must be maintained in a clean and neat order with no rips, tears, or <br />permanent stains present. <br />c. Must wear identification and appropriate safety vest at all times, which must be <br />furnished by the Contractor. <br />5. Vehicles and Equipment <br />a. Ensure that all contractor vehicles and equipment used in performing work in <br />conjunction with this project are mechanically and operationally sound; have <br />well -maintained exteriors; clean; have well -organized tool racks; bear <br />Contractor's company name, which is to be visible on both sides of the vehicle; <br />have current California registrations and licenses. <br />b. Vehicles of Contractor must have magnets which is to be visible on both sides <br />of the vehicle that say "Contractor for City of Santa Ana" and bear the city logo. <br />c. Vehicles must have 360-degree operational warning lights or traffic notification <br />light bars. <br />25F-25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.