My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
60A - CHANNEL REPAIR PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
07/02/2019
>
60A - CHANNEL REPAIR PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2019 5:20:57 PM
Creation date
6/27/2019 5:07:06 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
60A
Date
7/2/2019
Destruction Year
2024
Document Relationships
BOSCO CONSTRUCTORS, INC.
(Message)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Federal Emergency Manageme( .gency E-Grants <br />Page 3 of 16 <br />ORSAD50 - LOP # 1 Flood Channel <br />Orange CA No <br />Faculty Name: <br />ORSAD50 - LOP # 1 Flood Channel <br />Address 1: <br />Address 2: <br />County: <br />Orange <br />City: <br />State: <br />CA <br />ZIP: <br />Was this site previously damaged? <br />No <br />Percentage Work -Completed? <br />0.00 % <br />PA-09-CA4305-PW-00580(0): <br />South Harbor Blvd. <br />Location: <br />Damage Description and <br />PA-09-CA-4305-PW-00580(0): <br />Dimensions: <br />During the Incident period of January 18 - 23, 2017, City of Santa Ana <br />experienced severe winter storms, flooding and mudslides. The 2,811 <br />foot concrete trapezoidal storm water/flood control channel is comprised <br />of side to side 10ft (W) x 14ft (L) x 0.33ft (D) unreinforced side concrete <br />panels connected to a concrete floor. High velocity water intruded <br />behind the angled side concrete panels intermittently along the north <br />and south sides of the channel along approximately 800 feet of this <br />engineered structure. As a result of this water Intrusion, these panels <br />were displaced (settled or expanded) causing cracks and a non -linear <br />smooth flowing surface. <br />Specifically, the damages were: <br />Site 1: Flood Channel start GPS 33.741666-117.92222 to end GPS <br />33.740380-117.928653 <br />1. 73 - Unreinforced concrete panels damaged that measure <br />approximately 14ft x 10ft x 0.333ft. <br />14ft x 10ft = 140sf x 73 = 10,220sf /9=1135.5sy <br />2. Earthenbase material displaced under 73 damaged concrete panels <br />measuring approximately 14ft (L) <br />x 10ft (W) x 0.33ft (D)127 = 1.7cy x 73 panels = 125cy <br />Project Notes: <br />1. See the attached spreadsheet for detailed Calculations of damage for <br />each panel location and a cross section sketch of channel. <br />2. See the attached document that clarifies the land ownership of this <br />Food control channel as the City of Santa Ana. <br />3. See the attached e-mail messages addressing the jurisdiction of this <br />flood control channel. ,Based on the Applicants City Engineer <br />https://isotirce.fema,gov/dmmie/viewApplicaAOAtypliavigatabld&pageName=&vo.i... 7/26/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.