Laserfiche WebLink
Federal Emergency Manageme> .gency E-Grants <br />Page 4 of 16 <br />responses, this PW falls under the PA Assistance guidelines. USACE <br />does not have Jurisdiction of this channel. <br />PA-09-CA-4305-P W-00580(0): . <br />This PW Addresses LOP # 1 <br />Work To Be Completed: <br />This scope of work and cost estimate is necessary to return the <br />Applicant facility back to pre -disaster design and function. <br />The Applicant will utilize their Force Account to complete the following <br />work: <br />Remove 124.91 CY. -(14 ft. L x 10 ft. W x 0.33 ft. 0127 = 1.71 CY. x 73 <br />panels) unreinforced concrete panels. <br />Haul 187.37 Tons (124.91 CY.X 1.5 Factor) Concrete Debris to local <br />Landfill <br />Farms 10220 SF (14 ft. L x 10 ft. W = 140 SF X 37 panels) Concrete in <br />place. <br />Scope of Work: <br />Place 124.91 CY. Heavy weight concrete, Ready Mix (delivered). <br />Notes: <br />Damage to the earthen base material displaced under 73 damaged <br />concrete panelsis unknown at this time. <br />This Issue might be accounted at Close Out. <br />Landfill Tipping Fees were based on Orange County Tipping Fee Rate. <br />(See Attachment). <br />Estimated work was based on RSMeans Heavy Construction Cost Book <br />2017 Edition. <br />SOW Ends. <br />SCOPE NOTES: SEE ATTACHED <br />Hazard Mitigation Proposal <br />Is effective mitigation feasible on this site? <br />No <br />If you answered Yes to the above question, the next question is required <br />Will mitigation be performed on this site? <br />INo <br />If you answered Yes to the above question, the next question is required <br />Do you wish to attach a Hazard Mitigation <br />Proposal? <br />No <br />If you answered Yes to the above question, the next two questions are required <br />https://isource.fema.gov/emmie/ViewApplicatr6Dii nl=6avigatable&pageName=&vo,i.., . 7/26/2018 <br />