My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ STREET MAINTENANCE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
07/02/2019
>
23A - PROJ STREET MAINTENANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2019 5:09:54 PM
Creation date
6/27/2019 5:08:13 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
7/2/2019
Destruction Year
2024
Document Relationships
ALL AMERICAN ASPHALT (19)
(Message)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />JULY 2, 2019 <br />TITLE: <br />AWARD A CONSTRUCTION CONTRACT TO <br />ALL AMERICAN ASPHALT IN THE AMOUNT <br />OF $1,716,649 FOR THE LOCAL STREET <br />PREVENTATIVE MAINTENANCE FY 2018-19 <br />PROJECT <br />ESTIMATED DELIVERY COST: $1,900,000 <br />(PROJECT NO. 19-6942) <br />(STRATEGIC PLAN NO. 6, 1B; 1C; 1G) <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />❑ As Recommended <br />❑ As Amended <br />❑ Ordinance on V Reading <br />❑ Ordinance on 2nd Reading <br />❑ Implementing Resolution <br />❑ Set Public Hearing For <br />CONTINUED TO <br />FILE NUMBER <br />CITY MAIVAGER <br />RECOMMENDED ACTION <br />Award a construction contract to All American Asphalt, the lowest responsible bidder, in accordance <br />with the base bid in the amount of $1,716,649, for construction of the Local Street Preventative <br />Maintenance FY 2018-19 Project, for the term beginning upon execution of the contract and ending <br />upon project completion, and authorize the City Manager and the Clerk of the Council to execute the <br />contract subject to non -substantive changes approved by the City Manager and the City Attorney. <br />2. Approve the Project Cost Analysis for a total estimated construction delivery cost of $1,900,000, <br />which includes $1,716,649 for the construction contract, $115,351 for contract administration, <br />inspection and testing, and a $68,000 project contingency (approximately 4% of the construction <br />contract amount), paid with Measure M2 Local Fairshare funding. <br />DISCUSSION <br />The City's Pavement Management Program has been developed to identify the preventive maintenance <br />requirements for the City's street network. The local street segments recommended for the Fiscal Year <br />2018-19 Local Street Preventative Maintenance Capital Improvement Project have been identified as high <br />priorities for slurry seal (Exhibit 1). The recommended work consists of preparing the roadway by <br />performing minor pavement repairs, including localized replacement of asphalt concrete pavement, <br />followed by slurry seal resurfacing, crack seal, striping, and signage. The improvements also include <br />replacement of damaged concrete curbs, gutters, sidewalks, and curb ramps. Once completed, these <br />improvements will improve the City's overall pavement condition, enhance the visual appearance of the <br />street, upgrade ride quality, and further comply with Americans with Disability Act standards. <br />Public Outreach and Contractor Participation <br />To provide an opportunity for local vendors to submit bids, a Notice Inviting Bids was advertised in the <br />Orange County Register newspaper on May 8 and 15, 2019, and bids were received electronically via the <br />City's web -based electronic bidding system, PlanetBids, on May 29, 2019. Through the PlanetBids online <br />23A-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.