Laserfiche WebLink
for <br />T CORPORATION <br />Jam <br />gton Beach Lane <br />Huntington <br />Huntington Beach, CA 92647 <br />714:841.1988 <br />EnvironmentallySensitive Service Corporation <br />1.fax <br />www.tscmcorp.oom <br />Contractors License # 934760 <br />SCOPE OF SERVICES & SCHEDULE <br />A. Power Sweeping <br />1. Contractor shall supply all labor, materials, equipment and transportation necessary for the <br />removal of trash, dust and debris from parking lots, vehicular entryways, bus parking stalls and all <br />four levels of parking structure as indicated on the attached map (Exhibit A) of the Santa Ana <br />Regional Transportation Center (SARTC). <br />2. Contactor is required to sweep all designated areas two (2) times per week. All work at the <br />SARTC to be done between the hours of 11pm and 4am. <br />3, Contractor must leave the area clean and free of all trash, dust and debris. The Contractor must <br />remove all of the trash dust and debris from the facility. The sweeping process must not damage <br />any surfaces. The sweeping process must not damage adjacent areas in anyway. The contractor <br />will be responsible for all damage to the surrounding areas. <br />4. The contractor, upon completion of the job and prior to final acceptance, shall remove all <br />supplies, materials, debris, rubbish, etc., caused by the operation and leave the finished site in a <br />neat, orderly condition. <br />5. Sweeping must include area under and around vehicles parked in lots or in parking structure; in <br />or around all corners and recesses and other structures located within the sweeping area. <br />6. All curbs adjacent to the SARTC property must be swept, removing all dirt and grime. <br />7. The Contractor will be responsible for the disposal of all waste. <br />B. Power Washing <br />1. Contractor shall supply all labor, materials, equipment and transportation necessary for the <br />removal of stains and deposits from cement and brick paver sidewalks as indicated on the <br />attached site plan (Exhibit A) of the SARTC. <br />2. All work at the SARTC shall be performed seven days a week between the hours of 11pm and <br />4am. <br />3. The areas are described on the next page <br />91 <br />