My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TSCM CORPORATION (3)
Clerk
>
Contracts / Agreements
>
T
>
TSCM CORPORATION (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 2:21:43 PM
Creation date
7/3/2019 3:27:14 PM
Metadata
Fields
Template:
Contracts
Company Name
TSCM CORPORATION
Contract #
N-2019-117
Agency
PUBLIC WORKS
Expiration Date
6/30/2022
Insurance Exp Date
1/1/2024
Destruction Year
2027
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T A <br />�y, iC ( <br />Jamestown Lane <br />Huntington <br />Huntington Beach, CA 92647 <br />714.841.1988 <br />An Environmental) Sensitive Service Corporation <br />Y P <br />www.tsemcorp.com <br />www.tscmcorp.eom <br />Contractors License # 934760 <br />Steam Cleaning Areas& Freauenc <br />Four levels of parking structure <br />(all floors, ceiling, ledges, landings, walls, & pipes) <br />Annually <br />Pedestrian bridge overtracks <br />Annually <br />Walkway from main entrance to Santa Ana Blvd. <br />Semi -Annually <br />Concrete drive area from fountain to flags <br />Semi -Annually <br />North esplanade <br />Semi -Annually <br />East esplanade <br />Semi -Annually <br />Northbound platform* <br />Semi -Annually <br />Southbound platform <br />Semi -Annually <br />Parking Structure— North & south stairways and elevator landing areas <br />Quarterly <br />Parking Structure —1st floor east entrance area leading to Greyhound <br />area <br />Quarterly <br />Courtyard stairways to second level <br />Quarterly <br />Walkways from courtyard to south driveway and trash area <br />Quarterly <br />Northbound platform* (from bridge to Car 4 sign) <br />Quarterly <br />East and west pedestrian bridge stairs <br />Quarterly <br />Four entry archways (interior and exterior waits) <br />Santa Ana Blvd. next to the tracks, <br />• Santa Ana Blvd, main entrance <br />• Santiago St. main entrance, <br />• Near bus bay #1 <br />Quarterly <br />Bus Bays 1.10 <br />Monthly <br />Main entrance (fountain area) <br />Monthly <br />Courtyard <br />Monthly <br />South esplanade <br />Monthly <br />West esplanade <br />Monthly <br />All lower walls and columns/pillars with brick material in the areas described above are to be included in <br />the work performed. <br />*There is no water hookups located on or near the North Platform. <br />
The URL can be used to link to this page
Your browser does not support the video tag.