Laserfiche WebLink
' Jurupa HII1s Project l City of Fontana <br />'Responsible for performing daily construction inspection_ to an sure,contractor. <br />compliance with contract plans and spedficatlons and (ecording detailed 'daily <br />IN,TERWEST <br />i lnspection Assisted with pay quantity estimates, Tontract change•orders,' as <br />CONSULjING' <br />;i builtdrawings,andtrackingsched'ules.Inspectinglinegrade size,elevatlonsand <br />GR'O00 <br />f locations of'improvements, Preparatlon.and negotiations.of the .righi.of way <br />www.infePwocterp.cSrn <br />acquisitions with the,affected property owners Design sidewalks and driveway <br />I.retainingwallsonCitrus,Solver'ah85antaAhaAvenue:ProJectCost: <br />:approaches <br />$2.g mililom <br />Foothill'to Cypress / Randall-to Merrill./ -Oleander to Arrow Fiber optic <br />Installation's Street.lrtiprovemeot and Traffic Signal Protect lCity of Fontana <br />Responsible -for. performing -daily con"structlon'inspection."for trenching and <br />installation fiber opttc cable foctrafiic signal Installations'; Inspecting defours to <br />satisfaction of'the'City Traffc-Engineer.'Inspeding construction progress-- <br />payments'and setting pre -construction meeting: -Inspect _ sfreet'constructlbn, <br />•asphalt; curb and gutters, sidewalks, :driveways; ;curb •ramps, storm 'water, <br />installation on ;Randall and Merrill Avenue.. ins'pecfirig proper, bedding- and',, <br />backflll of utility trenches, construction of'roadway-courses and 'scheduling all. <br />requires'construction testing: Project Cost:,$4;3 m Iliom <br />Roman, Avenue Street Improvement,l, City-oLPalm'Springs,;Clty of baser_t Hot <br />Springs; Courity,of Riverside <br />Perform and supervise the Inspection:of. construction+work by -contractors} <br />prepare daily reports 'arid verify :and authorize --progress, payments .vilth <br />contractors and other public agencies. - inspect; cbnstru_ction _which included <br />retaining wall; curb and gutter,.rerpoval and replacement of concrete sidewalks,. <br />public; works construction of cross gutters, concrete curbrTatr ps,'driJeways, <br />installation of waterlines and 'sewer lines, placement: of Portland Cement, slurry <br />and'chlp sealing. Inspect and generating punch list apdsuperJise.preparatlon of <br />'",Bs -built" records � Project Cost: $7• rhillion. <br />Coachella'.Valley;ape _Mission, Spring Water, DistrictJ City of,lndio, City.o'f <br />Thousand Palm;_County of Riverside <br />RespdrisIble for inspecting pipe line installation, line and' grade verification, <br />oo'cuments aril. picture. recording,-detailed,daily IVspea- ion .eiponsible for <br />monftoring SWPPP and the RMPs implementations'and comply;with'the NPDES <br />Permit requirements::Also,._responslble .for performing,idally 'construction <br />inspection fo ensure contract& compliance with the contract plans and <br />'specifications, ana recording detailed daily inspection reports, <br />The Cove Project j City of Palm S' Irig; Caltrans -, bistrictg <br />Responi ble'for inspections of allconstruction activitiesto;eosure:contractor <br />compliance Wlth contract plans -and specifications and recording detailed daily <br />.inspecilons:'oversee Inspect mfiel onitord work; evork schedules and nspe_'dion <br />phases. Participated in numerous safety programsand_.s_t_rictlyenfo_rce_d_ safety <br />and health requirements_ on the site: <br />Page 68 <br />25F-110 <br />