Laserfiche WebLink
GARY MCCRE®IE <br />Senior Construction Inspector <br />Summary of Experience <br />Mr. McCredie has over 30 years of Construction industry experience <br />for all types of public works projects, He has worked on several large <br />construction infrastructure projects in Southern California, keeping <br />safety of employees, public, and quality assurance in place. He has <br />kept critical project deadlines and has maintained accurate project <br />documentation including daily reports, project photographs, redline <br />drawings, and supervised staff on several construction projects. <br />He has worked as an Inspector for numerous utility projects involving <br />major Infrastructure such as treatment plants, sewer, sewage lift <br />stations, pump stations, roadway construction, and deep trench <br />excavation in major arterial streets, storm drains, storm sewers, street <br />improvements, and conventional dry utilities. <br />Typical project responsibilities have included a thorough <br />understanding of the plans, specifications, contract documents, <br />monitoring and updating schedules, conducting weekly construction <br />meetings, daily reports, field verifications, and progress billings, <br />negotiation of change orders, and procurement of materials. He has <br />strong working knowledge of local City and regional green book <br />standards. <br />Relevant Project Experience <br />City of Laguna Niguel, Wood Cliff Sewer Project: This project for <br />Wood Cliff Sewer Project consisted of 280 feet of 33" VCP which was relocated at Metro Station on <br />Camino Capistrano. <br />Water Distribution and Transmission Systems, Various locations: McCredie provided his <br />services for hundreds of sewers, stone drains and water projects involving construction of <br />transmission and distribution systems. The pipe ranged in size from 4" to 54" utilizing all types of pipe <br />with depths up to 35'.Methods of construction noticed were open -cut, horizontal directional drilling, <br />slip -lining, re -lining, and pipe bursting. Most projects were installed in metropolitan areas requiring <br />major traffic control measures. The projects were performed for no less than 75 individual agencies. <br />SCWD, Santa Clara Ave. Sewer Main Replacement: This project consisted of the replacement of <br />3,000-11neal feel of 12-inch SDR-35 pipe. Project included the Installation of numerous sewer <br />manholes ranging in depth from 12-17 feet deep. The project utilized open -cut excavation. <br />Golden State Water Company: Mr. McCredie provided services on Madison Avenue Main <br />Replacement which consisted of over 1,500 feet of ductile iron pipe, gate valves, fire hydrants and <br />water services. <br />Kinder Morgan, Arcade Creek Stabilization: Mr. McCredie served as a Construction Inspector/ <br />Project Manager on this Geogrid-Reinforced cellular confinement retaining wall. This project consisted <br />of rebuilding the creek bank 17 feet in height and 115 feet in length. <br />121Page <br />25F-164 <br />