BRIAN FRENCH
<br />Senior Inspector
<br />wiring, and overhead signs
<br />Summary of Experience
<br />Mr. French has over 18 years of extensive public works
<br />inspector experience and quality control. As a public works
<br />Inspector, he has worked on asphalt and conventional asphalt
<br />overlay projects, storm drain installations and sewer lateral
<br />Installation projects. His knowledge includes: Green Book,
<br />Caltrans Standards/Specs, WATCH Manual, and traffic control;
<br />knowledge of asphalt concrete and emulsion technologies;
<br />catch basin -poured -in -place or precise; junction structures and
<br />collars; ADA compliant concrete ramps and reports; concrete
<br />sidewalks, curbs, gutters, driveway approaches and x-gutters;
<br />metal beam guard railing; landscaping; median curbs; concrete,
<br />asphalt and rubber pavement; storm drains and sewer
<br />construction; SWPPP; sound walls and retaining walls; ductile
<br />Iron water lines and channel slope paving. He Is also
<br />experienced in traffic signal lighting, traffic signal Installation and
<br />and pole foundations; interconnections and street lights.
<br />Relevant Experience
<br />Agency: City of Downey
<br />Contract Title: Street and Water Improvements on Lakewood Boulevard
<br />Scope of Services: Mr. French provided Street Inspection services on Lakewood Boulevard from
<br />Gallatin Road to 450-feet S/O Telegraph Road, and Lindell Avenue from 1-5 NB off Ramp to
<br />Telegraph Road. He also prepared daily reports, collected quantities, managed residents and
<br />business owners concerns and questions very professionally. He attended all daily and weekly
<br />progress and schedule meetings and handled day-to-day conflicting project requirements and
<br />many other demands to achieve the set goals for City of Downey's project. This project involved
<br />traffic control, traffic signal & light improvements, street improvements, water service lines, potable
<br />and recycled water improvements, removing and salvaging existing water utilities.
<br />Agency: City of Burbank
<br />Contract Title: North San Fernando Blvd Safety Project
<br />Scope of Services: Mr. French served as a Senior Construction Inspector and was responsible
<br />for coldmilling, asphalt paving, drainage systems, SWPPP reports, public safety, new ADA
<br />compliant ramps and filling out the 2015 Caltrans ADA ramp forms and picture forms, grading,
<br />class 2 base, concrete sidewalks and curb/gutters, public safety, traffic control, installing
<br />new/relocating/removing existing traffic signals/ communications, relocating signals, inspecting
<br />signal pole foundations, signing and striping. His work also included taking daily pictures,
<br />completing daily picture reports, writing daily reports, employee Interviews, writing daily reports,
<br />daily quantities and monthly estimates. This project was federally funded and cost $115,8769.00.
<br />Agency: City of Diamond Bar
<br />Contract Title: Street Rehabilitation Area 5 Road Maintenance Project; Brea Canyon Cutoff
<br />Roadway and Drainage Improvements
<br />Scope of Services: Mr. French served as a Senior Construction Inspector and was responsible for
<br />inspecting the pouring of new ADA compliant handicap ramps, sidewalks/driveways/curb and
<br />gutters, traffic control, coldmilling and paving AC. Brian's work also Included slurry, cape seal,
<br />crack sealing, weed abatement, backfilling, coldmilling, concrete driveways, concrete sidewalks,
<br />concrete aprons, concrete curb/gutters, signing and striping, monthly estimates, daily reports and
<br />141Page
<br />25F-166
<br />
|