Laserfiche WebLink
BRIAN FRENCH <br />Senior Inspector <br />wiring, and overhead signs <br />Summary of Experience <br />Mr. French has over 18 years of extensive public works <br />inspector experience and quality control. As a public works <br />Inspector, he has worked on asphalt and conventional asphalt <br />overlay projects, storm drain installations and sewer lateral <br />Installation projects. His knowledge includes: Green Book, <br />Caltrans Standards/Specs, WATCH Manual, and traffic control; <br />knowledge of asphalt concrete and emulsion technologies; <br />catch basin -poured -in -place or precise; junction structures and <br />collars; ADA compliant concrete ramps and reports; concrete <br />sidewalks, curbs, gutters, driveway approaches and x-gutters; <br />metal beam guard railing; landscaping; median curbs; concrete, <br />asphalt and rubber pavement; storm drains and sewer <br />construction; SWPPP; sound walls and retaining walls; ductile <br />Iron water lines and channel slope paving. He Is also <br />experienced in traffic signal lighting, traffic signal Installation and <br />and pole foundations; interconnections and street lights. <br />Relevant Experience <br />Agency: City of Downey <br />Contract Title: Street and Water Improvements on Lakewood Boulevard <br />Scope of Services: Mr. French provided Street Inspection services on Lakewood Boulevard from <br />Gallatin Road to 450-feet S/O Telegraph Road, and Lindell Avenue from 1-5 NB off Ramp to <br />Telegraph Road. He also prepared daily reports, collected quantities, managed residents and <br />business owners concerns and questions very professionally. He attended all daily and weekly <br />progress and schedule meetings and handled day-to-day conflicting project requirements and <br />many other demands to achieve the set goals for City of Downey's project. This project involved <br />traffic control, traffic signal & light improvements, street improvements, water service lines, potable <br />and recycled water improvements, removing and salvaging existing water utilities. <br />Agency: City of Burbank <br />Contract Title: North San Fernando Blvd Safety Project <br />Scope of Services: Mr. French served as a Senior Construction Inspector and was responsible <br />for coldmilling, asphalt paving, drainage systems, SWPPP reports, public safety, new ADA <br />compliant ramps and filling out the 2015 Caltrans ADA ramp forms and picture forms, grading, <br />class 2 base, concrete sidewalks and curb/gutters, public safety, traffic control, installing <br />new/relocating/removing existing traffic signals/ communications, relocating signals, inspecting <br />signal pole foundations, signing and striping. His work also included taking daily pictures, <br />completing daily picture reports, writing daily reports, employee Interviews, writing daily reports, <br />daily quantities and monthly estimates. This project was federally funded and cost $115,8769.00. <br />Agency: City of Diamond Bar <br />Contract Title: Street Rehabilitation Area 5 Road Maintenance Project; Brea Canyon Cutoff <br />Roadway and Drainage Improvements <br />Scope of Services: Mr. French served as a Senior Construction Inspector and was responsible for <br />inspecting the pouring of new ADA compliant handicap ramps, sidewalks/driveways/curb and <br />gutters, traffic control, coldmilling and paving AC. Brian's work also Included slurry, cape seal, <br />crack sealing, weed abatement, backfilling, coldmilling, concrete driveways, concrete sidewalks, <br />concrete aprons, concrete curb/gutters, signing and striping, monthly estimates, daily reports and <br />141Page <br />25F-166 <br />