Laserfiche WebLink
pictures, employee Interviews, SWPPP. <br />Agency: City of Bellflower <br />Contract Title: Placing of Slurry Seal on Various Streets and Alleyways <br />Scope of Services: Mr. French served as a Senior Construction Inspector where he was <br />responsible for inspecting the placing of street and alley slurry seal, traffic control and <br />signing/strlping. His work included traffic coordination, slurry seal, public relations, field <br />measurements of each streetlalley, quantities/estimates, employee interviews and daily <br />pictures/reports. <br />Agency. City of Anaheim <br />Contract Title: Street Improvement Project <br />Scope of Services: Mr. French served as a Senior Construction Inspector and was responsible <br />for the inspection of residential street slurry seal, publlc safety, traffic control, and <br />signing/striping. His work also Included traffic coordination, slung seal, public relations, field <br />measurements of each street, quantities/estimates, employee Interviews and daily <br />pictures/reports. <br />Agency: City of Bellflower/City of Downey <br />Contract Title: Foster Road Street Rehabilitation Project <br />Scope of Services: Mr. French was responsible for grading, installing new ADA compliant <br />handicap ramps, traffic control and coordinating field testing of materials. Work includes <br />traffic coordination, paving, landscaping, concrete sidewalks, concrete aprons, signing and <br />striping. The project cost was approximately $756,000 and was funded by local sources. <br />Agency: Caltrans District B <br />Contract Title: On -call Contract Administration & Construction Engineering for various <br />Projects in Barstow/ Needles/Hwy138 Widening <br />Scope of Services: As the Construction Inspector, Mr. French was responsible for grading, <br />class 2 base, asphalt, concrete, traffic control, quantities/ monthly estimates, SWPPP, <br />drainage systems, CCO work, employee interviews, writing daily reports and taking daily <br />pictures, scheduling compaction tests. <br />Agency: Caltrans District 7 <br />Contract Title: On -Call Contact Administration & Construction Engineering, Task Order #4 /#8 <br />Scope of Services: Construction Inspector: As the Construction Inspector Mr. French was <br />responsible for inspection, coordinating testing and construction management. He was also <br />responsible for inspection coordination with the District SWPPP inspectors. In addition, he <br />ensured that the contractors were in compliance with the approved SWPPP plan. Mr. French's <br />duties included: heavy traffic control and quality assurance; safety, environmental and labor <br />regulations and making sure the work was done In accordance with the plans and specifications. <br />Agency: City of Palm Desert <br />Contract Title: Joint Construction Projects (Volumes 1-4) <br />Scope of Services: As the Construction Inspector, Mr. French was responsible for roadway <br />excavation, subgrades, base work, AC and rubber overlay, temporary and permanent signage <br />and striping. He was also responsible for contractor compliance with specifications and <br />plans for the following projects: Volume 1 - Miles Avenue / Warner Trail Roadway <br />Improvement Plan, Volume 2 - Sanitary Sewer and Storm Drain Project, Volume 3 - Sanitary <br />Sewer Lift Station, Volume 4 - Miles Avenue Transition Line (16). <br />151Page <br />25F-167 <br />