pictures, employee Interviews, SWPPP.
<br />Agency: City of Bellflower
<br />Contract Title: Placing of Slurry Seal on Various Streets and Alleyways
<br />Scope of Services: Mr. French served as a Senior Construction Inspector where he was
<br />responsible for inspecting the placing of street and alley slurry seal, traffic control and
<br />signing/strlping. His work included traffic coordination, slurry seal, public relations, field
<br />measurements of each streetlalley, quantities/estimates, employee interviews and daily
<br />pictures/reports.
<br />Agency. City of Anaheim
<br />Contract Title: Street Improvement Project
<br />Scope of Services: Mr. French served as a Senior Construction Inspector and was responsible
<br />for the inspection of residential street slurry seal, publlc safety, traffic control, and
<br />signing/striping. His work also Included traffic coordination, slung seal, public relations, field
<br />measurements of each street, quantities/estimates, employee Interviews and daily
<br />pictures/reports.
<br />Agency: City of Bellflower/City of Downey
<br />Contract Title: Foster Road Street Rehabilitation Project
<br />Scope of Services: Mr. French was responsible for grading, installing new ADA compliant
<br />handicap ramps, traffic control and coordinating field testing of materials. Work includes
<br />traffic coordination, paving, landscaping, concrete sidewalks, concrete aprons, signing and
<br />striping. The project cost was approximately $756,000 and was funded by local sources.
<br />Agency: Caltrans District B
<br />Contract Title: On -call Contract Administration & Construction Engineering for various
<br />Projects in Barstow/ Needles/Hwy138 Widening
<br />Scope of Services: As the Construction Inspector, Mr. French was responsible for grading,
<br />class 2 base, asphalt, concrete, traffic control, quantities/ monthly estimates, SWPPP,
<br />drainage systems, CCO work, employee interviews, writing daily reports and taking daily
<br />pictures, scheduling compaction tests.
<br />Agency: Caltrans District 7
<br />Contract Title: On -Call Contact Administration & Construction Engineering, Task Order #4 /#8
<br />Scope of Services: Construction Inspector: As the Construction Inspector Mr. French was
<br />responsible for inspection, coordinating testing and construction management. He was also
<br />responsible for inspection coordination with the District SWPPP inspectors. In addition, he
<br />ensured that the contractors were in compliance with the approved SWPPP plan. Mr. French's
<br />duties included: heavy traffic control and quality assurance; safety, environmental and labor
<br />regulations and making sure the work was done In accordance with the plans and specifications.
<br />Agency: City of Palm Desert
<br />Contract Title: Joint Construction Projects (Volumes 1-4)
<br />Scope of Services: As the Construction Inspector, Mr. French was responsible for roadway
<br />excavation, subgrades, base work, AC and rubber overlay, temporary and permanent signage
<br />and striping. He was also responsible for contractor compliance with specifications and
<br />plans for the following projects: Volume 1 - Miles Avenue / Warner Trail Roadway
<br />Improvement Plan, Volume 2 - Sanitary Sewer and Storm Drain Project, Volume 3 - Sanitary
<br />Sewer Lift Station, Volume 4 - Miles Avenue Transition Line (16).
<br />151Page
<br />25F-167
<br />
|