My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - ENGINEERING TECH SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
07/16/2019
>
25F - AGMT - ENGINEERING TECH SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 5:04:18 PM
Creation date
7/11/2019 4:58:18 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
7/16/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
replace, ARHM, concrete work, Slurry (REAS type II), and several street overlay projects. He was <br />also responsible for submitting daily reports, bid items, and progress payments. <br />Agency: City of Burbank <br />Contract Title: Two Projects: Safe Route to School & I-51SR-134 Congestion Management Project <br />Scope of services: Mr. Jents was responsible for the inspection of Installation of new traffic signal <br />poles, conduits, traffic signal heads, pedestrian heads and rewiring intersections under LAPM, <br />federally funded projects. These projects involved replacing and rehabilitating Street reconstruction <br />as well on sections where the new poles were installed. <br />Agency: City of Garden Grove <br />Contract Title: Brookhurst Triangle Sewer Project <br />Scope of services: Craig provided Inspection services for the construction of this project which <br />Included construction of 15" to 18" VCP sanitary sewer pipes and replacement of a 14-inch water <br />main. His experience also Includes inspection work of the TrasklHaster water and sewer project. <br />Street rehabilitation including grind and overlay replacement of AC in staged lifts. <br />Agency: City of Whittier <br />Contract Title: Multiple Projects <br />Scope of services: Mr. Janis provided Inspection for major City Streets including widening, removal <br />and replacement of AC sections. Slurry seal type I and type II and restriping of streets. In addition to <br />street AC overlay project he also provided inspection for the 8" VCP sewer replacement project. <br />Agency: City of Midway City <br />Contract Title: Multiple Projects <br />Scope of services: Mr. Jents provided Inspection services for several projects that included street <br />resurfacing, street AC pavement replacement and 12" VCP sewer replacement project as well as the <br />15" & 18" VCP sewer replacement project Installation of new ADA ramps, rubberized and <br />conventional AC. Coordination with different agencies and utility companies. <br />191Page <br />25F-171 <br />
The URL can be used to link to this page
Your browser does not support the video tag.