My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - ENGINEERING TECH SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
07/16/2019
>
25F - AGMT - ENGINEERING TECH SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 5:04:18 PM
Creation date
7/11/2019 4:58:18 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
7/16/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and contract specifications. All required field tests were conducted on site before every pour. He was <br />actively involved In installation and testing of heavy equipment such as clarifier pumps, scour <br />blowers, and digesters. Alex prepared daily reports, collected quantities, managed residents and <br />business owners complaints very professionally. He attended daily and weekly progress and <br />schedule meetings as well as handled day -today handling of conflicting project requirements and <br />many other demands to achieve the set goals. <br />Agency: Enclna Wastewater Authority <br />Contract Title: Encina Wastewater Authority <br />Scope of services: Mr. Chandhok was the construction inspector for the Major Plant Rehabilitation <br />projects. The design Included a new bypass structure and bypass pumping of more than an average <br />of 20-mgd of raw wastewater to provide structure access. The structural repairs included demolition <br />of the concrete roof deck, and exposed and corroded rebar. New structural repair material and high <br />performance coating were installed along with the cured -in -place liner of the four, 48" influent pipes <br />between the structure and the headworks building. <br />Agency: City of Clairmont <br />Contract Title: Conjunctive Use Project Pipeline Facilities <br />Scope of services: Mr. Chandhok provided construction supervision and inspection during the <br />Installation of 2691 LF of 36-Inch diameter pipeline, 247 LF of 24-Inch diameter laterals, related <br />metering and flow control structures, 36- inch butterfly valve and flow meters, electrical and telemetry <br />systems as well as all related ancillary systems and needed site Improvements. His Inspections also <br />Included welding and hydro testing. He prepared daily reports, handled day-to-day conflicts and <br />managed any concerns and inquiries of the project in a professional manner. <br />Agency: City of Pasadena <br />Contract Title: Eastside Well Collector Centralized Disinfection Project, Pasadena Water and Power <br />Scope of services: Mr. Chandhok provided inspection services during the construction of the <br />sodium hypochlorite tank, aqua ammonia tank, chemical containment area, metering pumps, <br />analyzers, gas detection system, vaults, electrical panels, and other miscellaneous work. He <br />prepared daily reports, attended all necessary monthly meetings and was also responsible for the <br />final closeout of the project. <br />Agency: ARCO, City of Carson <br />Contract Title: Underground Piping Replacement Project <br />Scope of services: Alex provided construction supervision and Inspection during the replacement of <br />2,500 LF of 18" steel underground pipe with new 18° of above ground steel pipe, multiple large size <br />valves, blow -offs, and air vacs. His Inspections also Included welding and hydro testing. Mr. <br />Chandhok was also very professional in addressing any issues regarding the project. <br />Agency: Long Beach Water Department, City of Long Beach <br />Contract Title: Cast Iron Main Replacement Project <br />Scope of services: During the entire project, Mr. Chandhok provided inspections and quality <br />assurance of valves, startup, and commissioning. This project consisted of approximately 7,500 LF of <br />8-inch ductile iron waterline along Atlantic Avenue in the City of Long Beach. He attended all <br />meetings and answered any inquiries based on the project in an efficient and timely manner. He kept <br />In constant communication with the City's Water Department and provided all necessary documents <br />from Inspections. <br />231Page <br />25F-175 <br />
The URL can be used to link to this page
Your browser does not support the video tag.