Laserfiche WebLink
APPENDIX -RESUMES <br />q <br />various Cities, <br />community. The project also included a full infrastructure (roadways, <br />• Served as Principal <br />storm drain, water, sewer, parks, and utilities) needs and assessment and <br />Project Manager for the <br />cost analysis for this future development. <br />design, construction <br />San Elijo Ranch Drainage, Sewer and Water Master Plan, San Marcos: <br />and management of a <br />2,000 acre / 3500 unit master planned community. The project included <br />variety of projects, <br />literally miles of storm drain, sewer and water lines, sedimentation areas, <br />including: <br />pump stations, booster stations, water reservoirs and force mains. <br />o Major Infrastructure <br />Cannon Road Trunk Sewer and Pump Station - Design of 8-12-inch <br />projects for public <br />gravity sewer, 6 and 8 inch force main, pump station and wet well. City of <br />agencies (Freeway <br />Carlsbad <br />Interchanges, <br />• Penasquitos Canyon Trunk Sewer: PS&E for two miles 36-Inch gravity <br />Roadways, Water, <br />sewer Including design study reports. City of San Diego <br />Storrs Drain and <br />• Ranch Santa Fe Road: Relocation and rehabilitation of 1.5 miles of sewer <br />Sewer Facilities and <br />main. City of San Marcos <br />Master Plans). <br />• Arrowhead Springs Drainage, Sewer and Water Master Plan: 4,000-acre <br />o Commercial and <br />site at the foothills of San Bernardino Mountains, and includes 1,500 to <br />Retail Development. <br />2,000 residential units, 1,000,000 square feet of commercial and office <br />o Master Planned <br />space, 199-acre/18-hole public golf course, renovation and reuse of the <br />Communities. <br />historic Arrowhead Springs Hotel with a new 115 room annex, new 300- <br />o Residential <br />room hotel, a conference center, 14-acre corporate office area. <br />Development. <br />Otay River hydrology study and dam breach analysis: 22,000-acre Otay <br />o Educational/University <br />Ranch project in Chula Vista. Flows up to 33,000 cfs were studied for the <br />Infrastructure Master <br />Otay River. <br />Plan Studies and <br />Water Prolects: <br />Development. <br />. City of San Diego, Green Valley Water line design and construction. 5000 <br />• Extensive experience in <br />feet, 30" Reinforced concrete water line and pressure reducing station and <br />working with Caltrans <br />details for connection to a 60-inch San Diego County Water Authority <br />and County of Los <br />Pipeline. <br />Angeles. <br />• Extensive experience In <br />. City of San Diego, Structural. arch and encasement designs for road <br />NPDES requirements. <br />crossings over various SDCWA pipelines up to 108 inches in diameter. <br />• Extensive experience in <br />. City of San Diego, Design and construction of Mercy Road pressure <br />the management and <br />administration of <br />booster. <br />• City of San Bernardino, Design of 3500 feet of 20 to 36-inch ductile iron <br />federally and state <br />water transmission main for the development of University Park. <br />funded projects In <br />. City of San Bernardino, Design of over 10,000 feet of 8 thru 12-inch DIP <br />compliance with <br />water main for water distribution. <br />Caltrans Local <br />• City of San Bernardino, Structural arch design for road crossing over the <br />Assistance Procedures <br />Dept of Water Resources 109-inch Santa Ana pipeline. <br />Manual (LAPM). <br />• City of San Marcos Structural arch and encasement designs for road <br />• Estimated valuation of <br />crossings over various SDCWA pipelines up to 108 Inches in diameter. <br />projects that Mr. <br />• Design of 30-inch CMLC steel water transmission main and pressure <br />Ragland has been <br />reducing stations. Included structural designs for hanging the waterline on <br />involved is <br />a bridge. <br />approximately <br />• City of Carlsbad, Design of many thousands of feet of PVC and DIP water <br />$1,000,000,000. <br />lines for multiple subdivisions in the City with Carlsbad Municipal Water <br />District and the Olivenhain Water District. <br />Master Plans: <br />• San Elijo Hills Specific Plan. Provided planning, engineering, surveying <br />services for the design and development of the 2,000-acre 3,500 dwelling <br />unit Specific Plan and Master Tentative Map. <br />PROPOSAL FOR TRANRECH <br />ENGINEERING, TECHNICAL AND ADMINISTRATIVE SUPPORT SERVICES, RFP NO. 19.045 <br />25F-244 <br />