APPENDIX -RESUMES
<br />q
<br />various Cities,
<br />community. The project also included a full infrastructure (roadways,
<br />• Served as Principal
<br />storm drain, water, sewer, parks, and utilities) needs and assessment and
<br />Project Manager for the
<br />cost analysis for this future development.
<br />design, construction
<br />San Elijo Ranch Drainage, Sewer and Water Master Plan, San Marcos:
<br />and management of a
<br />2,000 acre / 3500 unit master planned community. The project included
<br />variety of projects,
<br />literally miles of storm drain, sewer and water lines, sedimentation areas,
<br />including:
<br />pump stations, booster stations, water reservoirs and force mains.
<br />o Major Infrastructure
<br />Cannon Road Trunk Sewer and Pump Station - Design of 8-12-inch
<br />projects for public
<br />gravity sewer, 6 and 8 inch force main, pump station and wet well. City of
<br />agencies (Freeway
<br />Carlsbad
<br />Interchanges,
<br />• Penasquitos Canyon Trunk Sewer: PS&E for two miles 36-Inch gravity
<br />Roadways, Water,
<br />sewer Including design study reports. City of San Diego
<br />Storrs Drain and
<br />• Ranch Santa Fe Road: Relocation and rehabilitation of 1.5 miles of sewer
<br />Sewer Facilities and
<br />main. City of San Marcos
<br />Master Plans).
<br />• Arrowhead Springs Drainage, Sewer and Water Master Plan: 4,000-acre
<br />o Commercial and
<br />site at the foothills of San Bernardino Mountains, and includes 1,500 to
<br />Retail Development.
<br />2,000 residential units, 1,000,000 square feet of commercial and office
<br />o Master Planned
<br />space, 199-acre/18-hole public golf course, renovation and reuse of the
<br />Communities.
<br />historic Arrowhead Springs Hotel with a new 115 room annex, new 300-
<br />o Residential
<br />room hotel, a conference center, 14-acre corporate office area.
<br />Development.
<br />Otay River hydrology study and dam breach analysis: 22,000-acre Otay
<br />o Educational/University
<br />Ranch project in Chula Vista. Flows up to 33,000 cfs were studied for the
<br />Infrastructure Master
<br />Otay River.
<br />Plan Studies and
<br />Water Prolects:
<br />Development.
<br />. City of San Diego, Green Valley Water line design and construction. 5000
<br />• Extensive experience in
<br />feet, 30" Reinforced concrete water line and pressure reducing station and
<br />working with Caltrans
<br />details for connection to a 60-inch San Diego County Water Authority
<br />and County of Los
<br />Pipeline.
<br />Angeles.
<br />• Extensive experience In
<br />. City of San Diego, Structural. arch and encasement designs for road
<br />NPDES requirements.
<br />crossings over various SDCWA pipelines up to 108 inches in diameter.
<br />• Extensive experience in
<br />. City of San Diego, Design and construction of Mercy Road pressure
<br />the management and
<br />administration of
<br />booster.
<br />• City of San Bernardino, Design of 3500 feet of 20 to 36-inch ductile iron
<br />federally and state
<br />water transmission main for the development of University Park.
<br />funded projects In
<br />. City of San Bernardino, Design of over 10,000 feet of 8 thru 12-inch DIP
<br />compliance with
<br />water main for water distribution.
<br />Caltrans Local
<br />• City of San Bernardino, Structural arch design for road crossing over the
<br />Assistance Procedures
<br />Dept of Water Resources 109-inch Santa Ana pipeline.
<br />Manual (LAPM).
<br />• City of San Marcos Structural arch and encasement designs for road
<br />• Estimated valuation of
<br />crossings over various SDCWA pipelines up to 108 Inches in diameter.
<br />projects that Mr.
<br />• Design of 30-inch CMLC steel water transmission main and pressure
<br />Ragland has been
<br />reducing stations. Included structural designs for hanging the waterline on
<br />involved is
<br />a bridge.
<br />approximately
<br />• City of Carlsbad, Design of many thousands of feet of PVC and DIP water
<br />$1,000,000,000.
<br />lines for multiple subdivisions in the City with Carlsbad Municipal Water
<br />District and the Olivenhain Water District.
<br />Master Plans:
<br />• San Elijo Hills Specific Plan. Provided planning, engineering, surveying
<br />services for the design and development of the 2,000-acre 3,500 dwelling
<br />unit Specific Plan and Master Tentative Map.
<br />PROPOSAL FOR TRANRECH
<br />ENGINEERING, TECHNICAL AND ADMINISTRATIVE SUPPORT SERVICES, RFP NO. 19.045
<br />25F-244
<br />
|