Laserfiche WebLink
APPENDIX -RESUMES t3 <br />trends and innovations in the engineering field. <br />Public Works Projects Experience: <br />Mr. Ackerman has also served as Project Design Engineer, Project <br />Manager, and Construction Manager/Resident Engineer on a number of <br />projects. Partial listing of projects representative of his project experience <br />on recent projects Include: <br />• Project Engineer for City of Commerce, Garfield Avenue Telegraph <br />Road to Malt Avenue Street Improvements; Eastern Avenue Pavement <br />Overlay Stevens Thru City Boundary; Garfield Avenue and Slauson <br />Avenue Intersection Improvements; Washington/Ayers Intersection: <br />Prepared PS&E. Federally funded projects as part of Stimulus <br />Program. <br />• Project Engineer for City of Baldwin Park, Francisquito Avenue Overlay <br />Project; Ramona Boulevard Overlay Project: Prepared PS&E. <br />Federally funded projects as part of Stimulus Program. <br />• Project Engineer for City of San Bernardino, Sewer upgrade project: <br />Preparation of a project PS&E for upgrade of main sewer lines at <br />various locations per the City's Sewer Master Plan. <br />• Project Engineer for City of Commerce - Master Sewer Study <br />Telegraph Corridor re -vitalization project: Documentation of existing <br />system. Design capacity analysis based upon land use designations. <br />Produced master plan study report for the project along with cost <br />estimates. <br />• Resident Engineer for Rosemead Safety and Enhancement and ADA <br />Improvements Project. Served as the Resident Engineer for the <br />Rosemead Safety and Enhancement Project. The project includes <br />widening and reconstruction of 2 miles of Rosemead Boulevard, <br />including new medians, bike lanes, signals, sidewalks, curb & gutter, <br />street lighting, landscape, street scape. The project is federally funded <br />and is managed in compliance with Caltrans Local Assistance <br />Procedures Manual. Cost $20m. <br />• Principal CM/Resident Engineer for Valley Boulevard Rehabilitation <br />and ADA Improvements Project (Federally Funded), Alhambra: Project <br />involved reconstruction, pavement overlay, medians, landscape, curb <br />and gutter, sidewalk, traffic signals and other misc. improvements. <br />Project was inspected and managed in compliance with Caltrans Local <br />Assistance Procedures Manual. Project also involved coordination with <br />Caltrans for work at the 710 Freeway ramps under Caltrans <br />Encroachment Permit. Project was completed in various phases, <br />Including nigh time construction for several phases, to minimize <br />inconvenience to public on this heavily travelled major Arterial. <br />• Principal CM/Resident Engineer for New Avenue, from North to South <br />City Limit Rehabilitation and ADA Improvements Project (Federally <br />Funded), Alhambra: Project involved reconstruction, pavement <br />overlay, curb and gutter, sidewalk, traffic signals and other misc. <br />improvements. Project was inspected and managed in compliance <br />with Caltrans Local Assistance Procedures Manual. Project also <br />involved coordination with Caltrans for work at the 1-10 Freeway ramps <br />under Caltrans Encroachment Permit. <br />• Principal CM/Resident Engineer for Garfield Rehabilitation and ADA <br />PR POSAL FOR <br />TrsansrccH <br />ENGINEERING, TECHNICAL AND ADMINISTRATIVE SUPPORT SERVICES, RFP NO. 19-00 <br />25F-248 <br />