My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - ENGINEERING TECH SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
07/16/2019
>
25F - AGMT - ENGINEERING TECH SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 5:04:18 PM
Creation date
7/11/2019 4:58:18 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
7/16/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX -RESUMES 9 <br />Improvements Project (Federally Funded), Alhambra: Project Involved <br />reconstruction, pavement overlay, curb and gutter, sidewalk, and other <br />misc. improvements. Project was inspected and managed in <br />compliance with Caltrans Local Assistance Procedures Manual. <br />• Principal CM/Resident Engineer for City of San Bernardino, Via Duct <br />Boulevard/2nd Street Realignment Project: Prepared PS&E and served <br />as Construction Manager/Resident Engineer. <br />• Project Engineer for CSUSB (Cal State SB University) San Bernardino <br />Main Access Road: Prepared PS&E and provided construction <br />administration for the project. Project involved design of a new <br />roadway for a length of approximately 1.5 miles, and include street, <br />medians, landscape, lighting, traffic signals, water, sewer, storm drain <br />and various other utilities. <br />• Project Engineer for CSUSB (Cal State SB University) Perimeter Road <br />for CSUSB Palm Desert Campus: Prepared PS&E for the project. <br />Improvements included street, water, landscape, grading, drainage, <br />street lighting and various other improvements. <br />• Project Engineerfor CSUSB (Cal State SB University): Campus Health <br />Center Expansion: Prepared PS&E for the project for grading, utilities <br />and civil engineering. <br />• Project Engineer for University of California, Riverside - West Campus <br />Infrastructure: Prepared West Campus Infrastructure Development <br />Design/Study, which identified utility and surface infrastructure <br />requirements, and how these improvements could be phased to <br />accommodate proposed campus growth, for an area of 236.8 acres to <br />support approximately 5 million gross square feet of academic, <br />research, support, and student housing facilities.. <br />/J <br />PROPOSAL FOR TRANSRCh <br />ENGINEERING, TECHNICAL AND ADMINISTRATIVE SUPPORT SERVICES, RFP NO.19-045 <br />25F-249 <br />
The URL can be used to link to this page
Your browser does not support the video tag.