Laserfiche WebLink
APPENDIX -RESUMES 9 <br />Improvements Project (Federally Funded), Alhambra: Project Involved <br />reconstruction, pavement overlay, curb and gutter, sidewalk, and other <br />misc. improvements. Project was inspected and managed in <br />compliance with Caltrans Local Assistance Procedures Manual. <br />• Principal CM/Resident Engineer for City of San Bernardino, Via Duct <br />Boulevard/2nd Street Realignment Project: Prepared PS&E and served <br />as Construction Manager/Resident Engineer. <br />• Project Engineer for CSUSB (Cal State SB University) San Bernardino <br />Main Access Road: Prepared PS&E and provided construction <br />administration for the project. Project involved design of a new <br />roadway for a length of approximately 1.5 miles, and include street, <br />medians, landscape, lighting, traffic signals, water, sewer, storm drain <br />and various other utilities. <br />• Project Engineer for CSUSB (Cal State SB University) Perimeter Road <br />for CSUSB Palm Desert Campus: Prepared PS&E for the project. <br />Improvements included street, water, landscape, grading, drainage, <br />street lighting and various other improvements. <br />• Project Engineerfor CSUSB (Cal State SB University): Campus Health <br />Center Expansion: Prepared PS&E for the project for grading, utilities <br />and civil engineering. <br />• Project Engineer for University of California, Riverside - West Campus <br />Infrastructure: Prepared West Campus Infrastructure Development <br />Design/Study, which identified utility and surface infrastructure <br />requirements, and how these improvements could be phased to <br />accommodate proposed campus growth, for an area of 236.8 acres to <br />support approximately 5 million gross square feet of academic, <br />research, support, and student housing facilities.. <br />/J <br />PROPOSAL FOR TRANSRCh <br />ENGINEERING, TECHNICAL AND ADMINISTRATIVE SUPPORT SERVICES, RFP NO.19-045 <br />25F-249 <br />