Laserfiche WebLink
APPENDIX -RESUMES 20 <br />monitoring programs in response to the significant adverse traffic and <br />circulation impacts that were identified. <br />Flood Control/Watershed Protection Projects — Prepared the <br />traffic/transportation component of the EIR for the Santa Clara River <br />Levee Project (SCR-3) for the Ventura County Watershed Protection <br />District. The project is located adjacent to the City of Oxnard. Prepared <br />the traffic/transportation component of the Initial Study/MND/EA for the <br />Sespe Creek Levee Improvements Project for the Ventura County <br />Watershed Protection District. This project is located near the City of <br />Fillmore. Conducted the traffic analysis for the EIR for the Metropolitan <br />Water District of Southern California's Lake Perris Pollution Prevention <br />and Source Protection Program in Riverside County near Moreno Valley. <br />Conducted the traffic analysis as a component of the EIR for the Sun <br />Valley Watershed Management Plan in Los Angeles. The study included <br />an analysis of the impacts of pipeline construction along roadways in the <br />San Fernando Valley section of Los Angeles. Prepared the traffic <br />component of the EIR for the San Gabriel River Master Plan for the Los <br />Angeles County Department of Public Works. <br />Plpellnes/Linear Construction Projects - Conducted the transportation <br />analysis for the Pacific Pipeline EIR/EIS, a proposed oil pipe extending <br />from Santa Barbara to the Los Angeles harbor area including segment <br />alignments within Ventura County. Conducted the transportation analysis <br />for an alignment of the Pacific Pipeline that extends from the Bakersfield <br />area of Kern County to the LA harbor. The analysis addressed <br />construction impacts on highways and rail lines for the proposed project <br />as well as several alternatives. Conducted the traffic analysis for the <br />construction of the North Hollywood Interceptor Sewer in the City of Los <br />Angeles, Prepared the traffic component of the negative declaration and <br />mitigation monitoring program forthe construction of a 96-inch sewer pipe <br />that was installed in the public right-of-way of Lomita Boulevard in the <br />cities of Los Angeles and Carson. The pipeline project was a component <br />of a major pipeline Installation project administered by the Los Angeles <br />County Sanitation Districts. <br />Port/Harbor Planning - Conducted a multi -modal transportation study <br />for the Ports of Long Beach and Los Angeles to identify deficiencies in <br />the transportation system into, out of, and through the harbor area. The <br />analysis focused on the movement of goods by highway, railroad, and <br />pipeline. Conducted traffic analyses for various development projects in <br />the Ports of Los Angeles and Long Beach, including the West Basin <br />Improvement Plan, the Pier 300 container terminal, the Hugo Neu-Proler <br />scrap metal terminal, the GATX liquid bulk terminal, the Pier A container <br />terminal, the harbor lead track rail improvements, the Pier 300 dry bulk <br />(coal) terminal, the Berth 212-215 container terminal, and the Berth 100 <br />container terminal. <br />Power Lines/Power Plants - Conducted the transportation impact <br />analysis for the Devers-Palo Verde power transmission line project that <br />extends from the Phoenix area of Arizona to the Colton/Redlands area of <br />California. The project alignment extends through Riverside and San <br />Bernardino Counties in California and Maricopa and La Paz Counties in <br />Arizona. Conducted the transportation impact analysis for the Alturas <br />Transmission Line EIR/EIS, a power line that extends from Allures in <br />.- j <br />PROPOSAL FOR TRANsmch <br />ENGINEERING, TECHNICAL AND ADMINISTRATIVE SUPPORT SERVICES, RFP NO. 19.0" <br />25F-260 <br />