My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - ENGINEERING TECH SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
07/16/2019
>
25F - AGMT - ENGINEERING TECH SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 5:04:18 PM
Creation date
7/11/2019 4:58:18 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
7/16/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX -RESUMES <br />32 <br />grant programs. <br />Engineer, Inspector, Office Engineer Services. The project included <br />Secured over $20m in <br />widening and reconstruction of 2 miles of roadway (including approx. <br />funding for during last 2 <br />6,000 tons rubberized AC overlay). The project was federally funded <br />cycles of MTA Call for <br />and managed in compliance with Caltrans Local Assistance <br />Projects Applications. <br />Procedures Manual. <br />• Extensive experience in <br />Cactus Avenue and Nason Street Improvements and 135' Span Bridge <br />working with Caltrans, <br />Project, City of Moreno Valley ($21m). Transtech provided <br />County of Los Angeles <br />CM/Resident Engineer, Inspector, Office Engineer Services. The <br />and other regional <br />funding included State Local Partnership Program (SLPP) grant and <br />agencies and Utility <br />was inspected and managed in compliance with Caltrans Local <br />Companies. <br />Assistance Procedures Manual. <br />• Extensive experience In <br />Rte 71/Mission BI Grade Separation Project (Federally Funded) City of <br />NPDES requirements. <br />Pomona ($40m). Transtech provided CM/Resident Engineer, <br />• Extensive experience in <br />Inspector, Office Engineer Services. Project was Inspected and <br />the management and <br />managed in compliance with Caltrans Local Assistance Procedures <br />administration of <br />Manual. Caltrans was the oversight/jurisdictional Agency. <br />federally and state <br />Bogert Trail Bridge Widening Project (Federally Funded), City of Palm <br />funded projects in <br />Springs ($5m). Transtech provided CM/Resident Engineer, Inspector, <br />compliance with <br />Office Engineer Services. The project is federally funded and being <br />Caltrans Local <br />managed in compliance with Caltrans Local Assistance Procedures <br />Assistance Procedures <br />Manual. <br />Manual (LAPM). <br />Eastern Avenue Street Rehab Project, City of Commerce ($1.5m). <br />• Served as Resident <br />Transtech provided CM/Resident Engineer, Inspector, Office Engineer <br />Engineer on several <br />Services. Funded by Measure AA Funds. Project is being inspected <br />Federally Funded <br />and managed in compliance with Caltrans Local Assistance <br />Projects. <br />Procedures Manual. Project involved Full Depth Reclaimed Pavement <br />Rehabilitation. <br />• <br />2016 Street Rehab Project, City of Commerce ($4m). Transtech <br />provided Design and CM, Inspection Services. <br />• <br />SR2S, BTA and Pavement Rehabilitation Projects (State Funded), City <br />of Temple City ($2m). Transtech provided CM/Resident Engineer, <br />Inspector, Office Engineer Services. Project was inspected and <br />managed in compliance with Caltrans Local Assistance Procedures <br />Manual. Project involved pavement rehabilitation (rubberized AC <br />overlay), curb and gutter, sidewalk, traffic signals, utilities, and other <br />misc. improvements. <br />• <br />710 Freeway Interim Improvements and Fremont Widening Project <br />(Federally Funded), City of Alhambra ($15m). Transtech provided <br />CM/Resident Engineer, Inspector, Office Engineer Services. Project <br />was inspected and managed in compliance with Caltrans Local <br />Assistance Procedures Manual. Project also involved coordination <br />with Caltrans for work at the 710 Freeway ramps under Caltrans <br />Encroachment Permit. <br />• <br />Via Duct Boulevard/2nd St Realignment and Metrolink Parking Facility, <br />City of San Bernardino ($6m). Provided CM/Resident Engineer, <br />Inspector, Office Engineer Services. Project was inspected and <br />managed In compliance with Caltrans Local Assistance Procedures <br />Manual. <br />• <br />New Avenue, from North to South City Limit Rehabilitation and ADA <br />Improvements Project (Federally Funded), City of Alhambra ($2m). <br />Provided CM/Resident Engineer, Inspector, Office Engineer Services. <br />OIL <br />PROPOSAL FOR TRANSTECH <br />ENGINEERING, TECHNICAL <br />AND ADMINISTRATIVE SUPPORT SERVICES, RFP NO. 19-045 <br />25F-272 <br />
The URL can be used to link to this page
Your browser does not support the video tag.