Laserfiche WebLink
APPENDIX -RESUMES 33 <br />Project was inspected and managed in compliance with Caltrans Local <br />Assistance Procedures Manual. <br />• Garfield Rehabilitation and ADA Improvements Project (Federally <br />Funded), Alhambra ($2m). Provided CM/Resident Engineer, <br />Inspector, Office Engineer Services. Project was inspected and <br />managed in compliance with Caltrans Local Assistance Procedures <br />Manual. <br />• Main Street Rehabilitation, from West to East City Limit Project, City of <br />Alhambra ($3m). Provided CM/Resident Engineer, Inspector, Office <br />Engineer Services. Project was Inspected and managed in <br />compliance with Caltrans Local Assistance Procedures Manual. <br />• CSUSB (Cal State SS University) San Bernardino Main Access Road: <br />Prepared PS&E and provided construction administration for the <br />project. Cost $5m. <br />• City of Commerce, Rosewood Community Center. Transtech was <br />retained by the City to take over the management of this multimillion <br />dollar facility which was 2 years behind schedule. Within 5 months, <br />Transtech brought the construction to substantial completion level <br />allowing the City to start the move -in process, and 2 months after, the <br />facility was opened to public use. Currently, Transtech is assisting the <br />City in claims analysis and change order resolution. Construction <br />Cost: $15m. <br />• City of Alhambra Downtown Revitalization Program: Involved 11 <br />projects, including Renaissance Plaza (multi-plex theater, public plaza <br />with fountain and unique art features, restaurants, retail, 800 space <br />parking structure), Fremont Plaza (modifications/reconstruction of <br />existing buildings for lease by ToysRUs and Party City, construction of <br />a new 30,000 SF store for PetSmart, and various other retail buildings) <br />and Downtown Revitalization (modification/upgrade of existing <br />buildings for Starbucks, 4 Restaurants and various retail businesses). <br />(Cost: $80m). <br />• City of Alhambra 4 parking structures: Transtech served as turn -key <br />project manager, including management of design, construction, <br />building plan check and inspection, federal funds, labor compliance for <br />4 parking structure projects. Chapel: 4 stories, 300 space structure; <br />First Street: 4 stories, 276 space structure; Garfield: 5 stories, 800 <br />space structure. Cost $15m; North First Street Mosaic: 5 stories, 320 <br />space structure, Cost $6m. <br />Civil Engineering Experience <br />1-710 Freeway Interim Improvements and Fremont Widening and <br />Reconstruction: Transtech provided Turn -key Services, including <br />Program Management, Construction Management, Design, <br />Surveying, Right -of -Way Engineering, and Environmental. The project <br />included major roadway improvements, removalldemolition of various <br />buildings for additional right-of-way and reconstruction of buildings <br />behind new right-of-way, traffic signals, infrastructure, utilities, <br />pavement, drainage, water, sewer, landscape, street lighting, traffic <br />signal, pavement improvements. Project was funded by Federal <br />Funds, and was managed and inspected in compliance with Caltrans <br />Local Assistance Procedures Manual. (Cost $15m). <br />PROPOSAL FOR TRANSTECh <br />ENGINEERING, TECHNICAL AND ADMINISTRATIVE SUPPORT SERVICES, RFP NO.19.00 <br />25F-273 <br />