My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - ENGINEERING TECH SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
07/16/2019
>
25F - AGMT - ENGINEERING TECH SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 5:04:18 PM
Creation date
7/11/2019 4:58:18 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
7/16/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bidding and Construction Support <br />During the bidding process, if so directed, the Interwest Team will be available to answer <br />bidders' questions, prepare drafts of addenda or clarifications to the PS&E and assist in <br />reviewing bids and recommending a contract award. <br />During construction, we will provide supplemental support to the City and construction <br />management section for construction inquiries. This supplemental construction support <br />Includes: <br />o Reviewing and preparing responses to RFIs <br />o Reviewing Contractor submittals and shop drawings for compatibility with design <br />o Reviewing and providing recommendations of change order proposals <br />o Performing final review/evaluation & assisting with the preparation of punch list for <br />work deficiencies <br />o Preparing record drawings of the completed projects based upon the redlined set of <br />as -built plans <br />Construction Phase <br />Project Schedule (_Submittal Review: A realistic schedule that meets the requirements of the <br />contract documents is critical to the success of the project. Our team will constantly monitor the <br />schedule, noting and making the City aware of any critical path slips, as well as any opportunities <br />to compress the schedule that may arise. Further, timely and thorough submittal review is critical <br />to a project. Examples of activities include: <br />• Coordinate, review & approve the Contractor's proposed schedule for completion of project. <br />Y Review contractor's schedule, update submittals for conformance to master schedule and <br />contract documents. <br />Document Control: We use the proven method of controlling documents through the system <br />developed and used by Caltrans. We will apply consistent procedures to track all documentation, <br />regardless of project size and location. Doing so will result In a standard documentation and filing <br />system across the board for capital projects. As a result, records retrieval will be quick and <br />efficient. Work activities include: <br />• Maintain all project documents, drawings, contract change orders, contractor submittals, <br />shop drawing and correspondence in electronic form and hard copy. <br />• Maintain at the project site an up-to-date copy of all contracts, drawings, specifications, <br />addenda, change orders & other modifications, in good order & marked to record all changes <br />made during construction. We track documents, including all correspondence. <br />• Ensure an office engineer is available for projects with significant document control needs, <br />and all files will be set up by our office engineer, regardless of size. <br />• Maintain a digital photographic library & significant activities. <br />• Maintain RFI, submittal and change order logs. Ensure consultants and engineers respond <br />within contract time frames. We track the number of days submittals are outstanding and <br />with a particular party on a weekly basis and report this information to the appropriate staff. <br />• Monitor Contractor and the sub -contractors regarding compliance with prevailing wage rates <br />and affirmative action requirements applicable to the project including a Labor Compliance <br />Program in accordance with AB 1506 and the Davis -Bacon Act. Our inspectors and office <br />engineers are trained on the appropriate forms and techniques necessary to conduct these <br />compliance activities. <br />INTERWEST <br />CONSULTING GROUP page 14 <br />25F-66 <br />
The URL can be used to link to this page
Your browser does not support the video tag.