My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23B - PROJ - CIVIC CENTER STORMWATER LIFT STATIONS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
07/16/2019
>
23B - PROJ - CIVIC CENTER STORMWATER LIFT STATIONS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 5:30:54 PM
Creation date
7/11/2019 5:24:31 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23B
Date
7/16/2019
Destruction Year
2024
Document Relationships
ARNAZ ENGINEERING CONTRACTORS, INC. (5)
(Message)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Page 2 <br />Civic Center Stormwaler Lift Station Renovation (17-2675), bidding on May 1, 2019 2:00 PM (Pacific) <br />Printed 05/232019 <br />Bid Results <br />Type <br />Item Code UOM City <br />Unit Price <br />Line Total Comment <br />4 <br />Construct structural Improvements <br />LS 1 <br />$45,000.00 <br />$45,000.00 <br />5 <br />Construct precast concrete stormwater treatment device <br />LS 1 <br />$40,000.00 <br />$40,000.00 <br />6 <br />Furnish and Install all mechanical piping and equipment within the Santa Ana Lift <br />Station and the Flower <br />Lift Station <br />LS 1 <br />$245,000.00 <br />$245,000.00 <br />7 <br />Furnish and Install all electrical equipment for the Santa Ana Lift Station and the Flower Lift Station <br />LS 1 <br />$360,000.00 <br />$360,000.00 <br />a <br />Excavation, haul, and disposal of excess material <br />LS 1 <br />$30.000.00 <br />$30,000.00 <br />9 <br />Temporary Pumping <br />LS 1 <br />$15,000.00 <br />$15,000.00 <br />10 <br />Programming and cloud based SCADA sysems Integration <br />LS 1 <br />$35,000.00 <br />$35,000.00 <br />11 <br />Commissioning, start-up, testing, demonstration, training and close-out <br />LS 1 <br />$35,000.00 <br />$35,000.00 <br />12 <br />Demobilization <br />LS 1 <br />$5,000.00 <br />$5,000.00 <br />13 <br />Labor Agreement Oversight <br />LS 1 <br />$10,000.00 <br />$10,000.00 <br />14 <br />Dry Well <br />EA 5 <br />$5,000.00 <br />$25,000.00 <br />Subtotal <br />$1,022,000,00 <br />Total <br />$1,022,000,00 <br />Punt' Iris <br />
The URL can be used to link to this page
Your browser does not support the video tag.