Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 17-2675 <br />CIVIC CENTER STORMWATER LIFT STATION RENOVATION <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Arnaz Engineering Contractors, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit price(s) or l unp sum(s) set forth in the following <br />schedule: <br />Item <br />Description Qty <br />Unit <br />Unit Price <br />Amount <br />Mobilization (not to exceed 5% of <br />I LS <br />$ <br />50,000. <br />$ <br />50,000.00 <br />1 <br />total bid) <br />Construct AC pavement, sitework. <br />1 LS <br />S <br />95,000. <br />$ <br />95,000.00 <br />2 <br />fences, gates and miscellaneous <br />concrete <br />Construct yard piping and utilities <br />I LS <br />$ <br />32,000. <br />$ <br />32,000.00 <br />3 <br />Construct structural improvements <br />I. t.S <br />S <br />45,000. <br />S <br />45,000.00 <br />4 <br />Construct precast concrete stormwater <br />I 1.S <br />$ <br />40,000. <br />S <br />40,000.00 <br />5 <br />treatment device <br />Furnish and install all mechanical <br />1 LS <br />S <br />245,000. <br />$ <br />245,000.00 <br />6 <br />piping and equipment within the Santa <br />Ana Lift Station and the Flower Litt <br />Station <br />Furnish and install all electrical <br />I LS <br />$ <br />360,000. <br />S <br />360,000.00 <br />7 <br />equipment for the Santa Ana Lilt <br />Station and the Flower Lill Station <br />Excavation, haul, and disposal of <br />I LS <br />$ <br />30,000. <br />$ <br />30,000.00 <br />8 <br />excess material <br />Temporary Pumping <br />I LS <br />$ <br />15,000. <br />$ <br />15,000.00 <br />9 <br />Programming and cloud based <br />1 LS <br />$ <br />35,000. <br />S <br />35,000.00 <br />to <br />SCADA systems integration - <br />Commissioning, start-up, testing. <br />I LS <br />$ <br />35,000. <br />$ <br />35,000.00 <br />I I <br />demonstration, training and close-out <br />Demobilization <br />LS <br />5,000. <br />$ <br />5,000.00 <br />12 <br />Labor Agreement Oversight <br />I LS <br />$ <br />10.000 <br />$ <br />10,000 <br />13 <br />P-1 ofP-16 <br />23B-9 <br />