Laserfiche WebLink
Award Construction Contract to G.J. Gentry General Engineering, Inc. <br />Citywide Sewer Main Improvements Project <br />August 20, 2019 <br />Page 2 <br />eliminate sewer main obstructions, prevent sewer overflows, and reduce sewer maintenance <br />requirements. In addition, the improvements will enhance ride quality and surface drainage. <br />Public Outreach and Contractor Participation <br />To provide an opportunity for local vendors to submit bids, a Notice Inviting Bids was advertised <br />in the Orange County Register newspaper on May 10 and 15, 2019, and bids were received <br />electronically via the City's web -based electronic bidding system, PlanetBids, on June 19, 2019. <br />Through the PlanetBids online portal, vendors may register to receive notifications on all current <br />and future City projects, as well as download contract documents, receive project updates and <br />submit bids electronically. <br />A total of 112 vendors, including 5 located in the City of Santa Ana, were notified of the project <br />via PlanetBids. 52 vendors requested bidding documents and 11 bids were received. No bids <br />were received from Santa Ana contractors. <br />Bid Results Summary <br />RANK <br />BIDDER'S NAME <br />LOCATION <br />BASE BID <br />1 <br />G.J. Gentry General Engineering, Inc. <br />Upland <br />$1,269,090 <br />2 <br />Vasilj Inc. <br />Irwindale <br />$1,570,115 <br />3 <br />CHI Construction <br />Anaheim <br />$1,672,809 <br />4 <br />Kordich Construction, Inc. <br />Cypress <br />$1,779,399 <br />5 <br />Mike Prlich and Sons, Inc. <br />Baldwin Park <br />$1,795,125 <br />6 <br />MNR Construction Inc. <br />La Verne <br />$1,814,450 <br />7 <br />Christensen Brothers General <br />Engineering, Inc. <br />Apple Valley <br />$1,852,304 <br />8 <br />All Cities Engineering, Inc. <br />Jurupa Valley <br />$1,865,710 <br />9 <br />Excel Paving Cc <br />Long Beach <br />$1,871,154 <br />10 <br />O'Duffy Bros Inc. <br />Romoland <br />$2,040,995 <br />11 <br />Colich & Sons L.P. <br />Gardena <br />$3,020,775 <br />All 11 bids received were deemed responsive. G.J. Gentry General Engineering, Inc., submitted <br />the lowest responsive bid in the amount of $1,269,090 (Exhibit 2). Based on the bid analysis and <br />a contractor's reference check, staff recommends awarding the construction contract to G.J. <br />Gentry General Engineering, Inc. in the amount bid (Exhibit 3). <br />23A-2 <br />