My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
60B - TENT PARCEL MAP
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
08/20/2019
>
60B - TENT PARCEL MAP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2019 5:51:10 PM
Creation date
8/15/2019 5:33:31 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
60B
Date
8/20/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tentative Parcel Map No. 2018-02 — AMG First Point Subdivision <br />July 31, 2019 <br />Page 3 <br />parcel map, the applicant intends to start construction on the mixed -use development entitled by the <br />Planning Commission on June 4, 2018 (Site Plan Review No. 2017-9). Since this application is to <br />create two condominium units, no major issues were identified with the proposal. in reviewing the <br />project, staff determined that the proposal as conditioned Is consistent with the various provisions of <br />the City's Zoning Code, the C-2 zoning district and MEMU Overlay Zone standards including lot <br />size, lot frontage, setbacks, lot coverage, and parking, as well as the City's General Plan. <br />Conditions of approval are proposed for the map to ensure the development site Is maintained and <br />does not become a blight on the area, and that the projects required density bonus agreement be <br />approved prior to approval of the final map. No adverse environmental Impacts to fish or wildlife <br />populations were identified as the project site is located in a built -out, urbanized area. Finally, the <br />tentative parcel map was found to be consistent with the California Subdivision Map Act and <br />Chapters 34 and 41 of the Municipal Code. <br />Public Notification <br />The project site is located within the boundaries of the Lyon Street Neighborhood Association. The <br />president of this Neighborhood Association was contacted by staff and was notified by mall 10 <br />days prior to this public hearing. In addition, the project site was posted with a notice advertising <br />this public hearing, a notice was published in the Orange County Reporter and malled notices were <br />sent to all property owners within 500 feet of the project site. At the time of this printing, no areas <br />of concern were raised, nor had any correspondence, either written or electronic, been received <br />from the neighborhood president or from any members of the public. <br />CEQA Compliance <br />In accordance with the California Environmental Quality Act (CEQA), the initial project, Site Plan <br />Review No. 2017-09, considered by the Planning Commission on June 4, 2018, was determined to <br />be adequately evaluated in the previously certified EIR No. 2006-01 as per Section 15162 of the <br />CEQA guidelines. Ail mitigation measures in EIR No. 2006-01 and associated Mitigation Monitoring <br />and Reporting Program (MMRP) have been enforced and continue to apply to the proposed project. <br />The proposed subdivision does not include substantial changes to the already -approved <br />development project that require major revisions of the previous EIR, and no substantial changes to <br />the circumstances under which the subdivision is being taken since the original Site Plan Review's <br />approval by the Planning Commission In June 2018. Moreover, no information of substantial <br />importance has been received since the original EIR's certification in 2007 and the Subsequent EIR's <br />certification in 2018 that trigger knowledge or Impacts from new significant effects, increase in <br />severity of significant effects, new mitigation measures that are considerably different from the <br />original mitigation measures or that are now feasible. As a result, pursuant to Section 15162 of the <br />CEQA guidelines, no further CEQA documentation will be required for the project. <br />As outlined in this staff report, the project and subdivision are consistent with the City's General Plan <br />and the MEMU regulating plan. Further, it is consistent with the density bonus provisions outlined in <br />the City's Housing Opportunity Ordinance. The project site Is located within city limits and is less <br />�. 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.