My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3- MND 2016-156; GPA 2018-05; AA 2018-08_301 N TUSTIN
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2018
>
10-08-2018
>
3- MND 2016-156; GPA 2018-05; AA 2018-08_301 N TUSTIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 1:00:09 PM
Creation date
8/16/2019 12:59:14 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 3-3 <br />EXISTING PEAK HOUR INTERSECTION CAPACITY ANALYSIS <br />Key Intersection <br /> <br />Jurisdiction <br /> <br />Minimum <br />Acceptable <br />LOS <br />Control <br />Type <br />Time <br />Period ICU/HCM LOS <br />1. Tustin Avenue at <br />Fourth Street Santa Ana E 8 Traffic <br />Signal <br />AM 0.602 B <br />PM 0.783 C <br />2. Tustin Avenue at <br />First Street Tustin D 6 Traffic <br />Signal <br />AM 0.490 A <br />PM 0.517 A <br />3. SR-55 SB Ramps at <br />Fourth Street <br />Santa Ana/ <br />Caltrans D 3 Traffic <br />Signal <br />AM 0.902 E <br />PM 0.783 C <br />4. SR-55 NB Ramps at <br />Fourth Street/Irvine Boulevard <br />Tustin/ <br />Caltrans D 3 Traffic <br />Signal <br />AM 0.699 B <br />PM 0.757 C <br /> <br />3-77
The URL can be used to link to this page
Your browser does not support the video tag.