Laserfiche WebLink
2525 North Main Street  <br />January 14, 2019  <br />Page 2  <br />  <br />Other  entitlements  requested  include  a  development  agreement  between  the  City  and  <br />applicant/owner, a general plan amendment to redesignate the property from Professional &  <br />Administrative Office (PAO) to District Center (DC), and an amendment application to rezone the  <br />property from Professional (P) to Specific Development No. 93 (SD‐93).  <br />Staff is recommending the conditional approval of the project subject to project modifications  <br />such as:  <br />• Reduce the density to 81 dwelling units per acre, a maximum of 476 units  <br />• Revise the unit mix; reduce the number of studio and one‐bedroom units to 70  <br />percent of the project and increase the number of two and three‐bedrooms to 30  <br />percent of the project  <br />• Provide parking at a capacity of 2.0 spaces per unit  <br />• Provide courtyards along the north elevation  <br />Project Location and Site Description  <br />The subject site is a 5.93‐acre parcel located at the northeast comer of Main Street and Edgewood  <br />Road. Regional access to the site is provided from the Santa Ana (I‐5) Freeway via Main Street, a  <br />6‐lane arterial roadway, and via the State Route 22 (SR‐22) Freeway. The properties immediately  <br />adjacent to the site include Santiago Park to the north, single‐family residential homes to the  <br />south and east and the Discovery Science Center of Orange County is across Main Street to the  <br />west. The project site is located on North Main Street, an urban corridor within the City. The site  <br />is  also  located  at  a  main  entry  point  to  the  Park  Santiago  Neighborhood,  a  residential  <br />neighborhood predominantly comprised of detached single‐family dwellings.  <br />The site is currently improved with an 81,172 square foot, two‐story office building with 442  <br />parking spaces and associated mature trees and landscaping. The building has been vacant since  <br />summer 2017 and was last occupied by Wells Fargo. The Discovery Science Center of Orange  <br />County leases the parking lot for employee and overflow parking.   <br />Table 1: Project Location Information  <br />Item Information  <br />Project Address  2525 North Main Street  <br />Nearest Intersection  Main Street and Edgewood Road <br />General Plan  <br />Designation  <br />Existing: Professional &  <br />Administrative Office PAO  <br />Proposed: District Center (DC)  <br />Zoning Designation Existing: Professional (P) Proposed: Specific Development No. 93  <br />SD‐93  <br />Surrounding Land Uses  North  Santiago Park — Open Space  <br />East  Single‐Family Residential — R1 <br />Commented [DH1]: Exactly.  A residential  <br />neighborhood predominantly comprised of  <br />detached single‐family dwellings.