Laserfiche WebLink
2525 North Main Street  <br />January 14, 2019  <br />Page 6  <br />  <br />This project is required to comply with the City’s Housing Oppo rtunity Ordinance (HOO). To satisfy  <br />the provisions of the HOO, applicant is proposing to pay an in‐lieu fee in excess of $6,000,000.  <br />See Table 4 below for a breakdown of the proposed HOO fee.  <br />Table 4: Housing Opportunity Fee Summary  <br />Habitable Square Footage Inclusionary Housing Fee Estimated Fee  <br />404,746 $15 per square foot   $6,071,190  <br />*As measured from the exterior walls of the residential units. This calculation does not include exterior  <br />hallways, common areas, landscape, open space or exterior stairways*  <br />Analysis of the Issues  <br />Environmental Impact Report  <br />The  applicant  submitted  a  development  proposal  that  requires  the  approval  of  several  <br />discretionary applications. Given the size and location of the project, as well as the proposed  <br />zoning and general plan modifications, extensive environmental review was needed. After  <br />completion  of  the  Initial  Study  for  the  project,  it  was  determined  that  the  California  <br />Environmental Quality Act (CEQA) required the preparation and certification of an environmental  <br />impact report (EIR) for this project. The purpose of an EIR is to identify the significant effects on  <br />the environment of a project, to identify alternatives to the project, and to indicate the manner  <br />in which those significant effects can be mitigated or avoided. To determine what potential  <br />effects would be caused by the project, the EIR analyzed issues related to Aesthetics; Air Quality;  <br />Biological  Resources;  Cultural/Historic  Resources;  Greenhouse  Gas  Emissions;  Hazards  and  <br />Hazardous Materials; Land Use and Planning; Noise; Population and Housing; Public Services;  <br />Transportation  and  Circulation;  Tribal  Cultural  Resources;  Utilities  and  Service  Systems;  and  <br />Energy.  <br />On  February  12,  2018,  the  Initial  Study  and  Notice  of  Preparation  were  released  to  solicit  <br />comments regarding the scope and content of the Draft EIR (DEIR). A scoping meeting was held  <br />on March 1, 2018 with approximately 164 people in attendance and a total of 163 written  <br />comment  letters  were  received  at  the  conclusion  of  the  30‐day  public  comment  period.  <br />The comments were reviewed and additional areas of analysis and studies were added to the  <br />scope of the Draft EIR as appropriate. The comments are included as Appendix A of the Draft EIR.  <br />The Draft EIR analyzed the direct and indirect impacts resulting from construction and operation  <br />of the proposed project. In addition to analyzing fourteen environmental topic areas, the EIR also  <br />evaluated three options for access and egress to the project. The analysis included Main Street  <br />access only as proposed (Option A), access from Main Street plus a secondary access/egress  <br />driveway  at  the  Main  Street  and  Walkie  Way/Santiago  Park  intersection  (Option  B),  and  <br />access/egress from both Main Street and Edgewood Road (Option C).  <br />Three project alternatives were also analyzed within the document. These included a no build  <br />alternative, where the existing approximately 80,000 square foot building would remain as is and  <br />be reoccupied by an office use (Alternative 1); a reduced multi‐family project consisting of a  <br />Commented [DH9]: FYI…  <br />At $210,000 to $240,000 to build a low  <br />income housing unit this equates to 25 to 29  <br />units.  <br />Commented [DH10]: This should be a red  <br />flag to everyone!  <br />Commented [DH11]: I do not see the  <br />additional areas of analysis that were added.   <br />This should be identified.