My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4 -CUP19-01; ME19-01_4405 W EDINGER
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
01-28-19
>
4 -CUP19-01; ME19-01_4405 W EDINGER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:16:48 PM
Creation date
8/16/2019 4:15:53 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution No. 2019-xx <br />Page 8 of 10 <br /> <br />15. This project shall be reviewed by Planning staff annually for three years after <br />issuance of the Certificate of Occupancy for the community service building in order <br />to monitor any parking or traffic impacts that may arise from the operations. <br /> <br />16. A decorative 6-foot solid masonry wall shall be constructed along Regents Drive. <br />There shall be no pedestrian or vehicular gates along the wall. <br /> <br />17. A solid masonry wall shall be constructed along the exterior property lines abutting <br />the residential parcels prior to the commencement of demolition of the existing <br />structures or other construction activity. <br /> <br />18. The landscaping along Regents Drive shall be irrigated and landscaping maintained <br />consistent with the approved landscape plan which shall include vines. <br /> <br />19. Prior to the issuance of a building permit, a lot merger to create one lot shall be <br />recorded. <br /> <br />20. Prior to the issuance of a building permit, a construction phasing and construction <br />parking management plan shall be submitted. Temporary construction fencing <br />including green screen mesh shall be installed. <br /> <br />21. The applicant is responsible for the removal of all graffiti on the premises. The graffiti <br />shall be removed within 72 hours of occurrence. <br /> <br />22. Prior to the issuance of a building permit, a Property Maintenance Agreement must <br />be recorded against the property. The agreement will be subject to review and <br />applicability by the Planning and Building Agency, the Community Development <br />Agency, the Public Works Agency, and the City Attorney to ensure that the property <br />and all improvements located thereupon are properly maintained, Developer (and <br />the owner of the property upon which the authorized use and/or authorized <br />improvements are located if different from the Applicant) shall execute a <br />maintenance agreement with the City of Santa Ana which shall be recorded against <br />the property and which shall be in a form reasonably satisfactory to the City <br />Attorney. The maintenance agreement shall contain covenants, conditions and <br />restrictions relating to the following: <br /> <br />(a) Compliance with operational conditions applicable during any period(s) of <br />construction or major repair (e.g., proper screening and securing of the <br />construction site; implementation of proper erosion control, dust control and <br />noise mitigation measure; adherence to approved project phasing etc.); <br /> <br />(b) Compliance with ongoing operational conditions, requirements and <br />restrictions, as applicable (including but not limited to hours of operation, security <br />requirements, the proper storage and disposal of trash and debris, enforcement <br />of the parking management plan, and/or restrictions on certain uses, <br /> <br />4-20
The URL can be used to link to this page
Your browser does not support the video tag.