My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1 - CUP18-27_1703 E 17TH STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
02-25-19
>
1 - CUP18-27_1703 E 17TH STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:26:51 PM
Creation date
8/16/2019 4:25:10 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />no changes to vehicular lane configurations as a result of potential new bicycle lanes were <br />assumed in this analysis. <br /> <br />Per Santa Ana Circulation Element Update, the City’s long-range plan proposes a landscape <br />median along 17th Street within the Study Area. This would prohibit any left-turns into the Project <br />Site in the long-range future conditions. This landscape median improvement project is currently <br />not funded or scheduled. Analysis for this long-range configuration is discussed in Chapter 4 <br />and detailed capacity calculation worksheets are provided in Appendix C. <br /> <br /> <br />FUTURE WITHOUT PROJECT TRAFFIC CAPACITY CONDITIONS <br /> <br />Table 5 summarizes the weekday morning and afternoon peak hour LOS results for each of the <br />signalized study intersections under Future without Project Conditions. Table 5 indicates that all <br />three study intersections are projected to operate at LOS C or better during both the weekday <br />morning and afternoon peak hours. <br /> <br />Appendix C of this report contains the detailed capacity calculation worksheets. <br />141-75
The URL can be used to link to this page
Your browser does not support the video tag.