My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
05-13-19
>
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:50:43 PM
Creation date
8/16/2019 4:46:03 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
598
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2I <br /> 2.0 GENERAL SUMMARY OF ENVIRONMENTAL IMPACTS AND MITIGATION <br /> MEASURES <br /> 2.1 Land Use <br /> The project would result in the demolition of Nainstreet <br /> Center, rehabilitation of Fashion Square and provide a maximum <br /> development of 3,100,000 square feet of office/retail coninercial use <br /> and 1,200 hotel rooms on the site. The project is consistent with the <br /> Community Shopping Center land use designation for the site while a <br /> small portion of the site would require a zone change from Rd (Single <br />ii Family Residential) to C-2 (General Connercial). The tenants of <br /> Main Street Center and some Fashion Square tenants will require <br /> relocation due to the project. The project would accomplish the <br /> objectives of the Redevelopment Plan by revitalizing and restoring the <br /> economic, physical and social health of the Redevelopment Project Area. <br /> Without mitigation, the project would result in the loss of <br /> approximately 198 parking spaces used for parking for the KLST-owned <br /> Fidelity Federal Savings building, but mitigation measures are available <br /> which would allow that building to retain an acceptable level of parking <br />L spaces in accordance with City code standards. <br /> Mitigation Measures <br /> (a) The project should be landscaped similar to or more <br /> extensive than the existing landscaping in order to buffer the <br /> development from surrounding residential areas as much as possible. <br /> (b) All tenants displaced by the project will be provided <br /> assistance in accordance with State law and Santa Ana Redevelopment <br /> Agency policies. <br /> Cc) The Agency and the Project Participants should offer KLST <br /> land (including the Agency owned land to the south of the Fidelity <br /> Savings Building and a portion of the project site in the near vicinity) <br /> 3
The URL can be used to link to this page
Your browser does not support the video tag.