My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
05-13-19
>
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:50:43 PM
Creation date
8/16/2019 4:46:03 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
598
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
at fair market value (or fair rent, if a lease arrangement is preferred) <br /> in trade-off against the acquisition of Sales Parcels 3 and 5. The land <br /> area so offered should be sufficient to allow a total of at least 351 <br /> parking spaces serving the Fidelity Savings building assuming a maximum <br /> permitted amount of small car spaces, with the Agency and/or Project <br /> Participants bearing any necessary design and installation costs. <br />I <br /> 2.2 Soils and Geology <br />I - <br /> Impicts <br />U There are no anticipated soil and geology impacts with the <br /> proposed project. <br />C: <br /> Mitigation Measures <br /> No mitigation measures are proposed. <br />I-.--. <br /> 2.3 Hydrology <br />I.. Impacts <br />C The existing drainage facilities that serve the site should be <br /> adequate to acconnodate the additional runoff generated by the project. <br /> Mitigation Measures <br /> No mitigation measures are proposed. <br /> 4
The URL can be used to link to this page
Your browser does not support the video tag.