My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
05-13-19
>
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:50:43 PM
Creation date
8/16/2019 4:46:03 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
598
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Provide funding to install traffic signals on La Veta <br /> Avenue at Bedford Road and the southbound Rte 57 Fwy <br /> off-ramp. <br /> 7. Develop and implement an aggressive TSM Program to <br /> maximize use of transit, ride sharing and staggering of <br /> work hours with a goal of achieving a 20 percent <br /> reduction in overall trip generation. <br />L. S <br /> 8. Develop an on-site pedestrian circulation plan with <br /> buildings designed to acconnodate second level access <br />C. from a transit station and/or a pedestrian bridge located <br /> in the vicinity of Main Street/Town and Country road. <br />t-S <br />I-- <br />I-. <br />L-. <br />I-- <br /> 7
The URL can be used to link to this page
Your browser does not support the video tag.