My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
05-13-19
>
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:50:43 PM
Creation date
8/16/2019 4:46:03 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
598
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
development, relative to that of county-wide development, is not <br /> considered significant. Any structure constructed on the site over <br /> approximately 58 feet in height would require Federal Aviation <br /> Administration approval. The Federal Aviation Administration would make <br /> a determination as to the aeronautical hazard of any proposed structures <br /> which intrude above the imaginary horizontal surface of 203 feet above <br /> sea level. Flashing-red obstruction lights might be required as a <br /> precaution for aircraft safety. <br />L Mitigation Measures <br />U No mitigation measures are proposed. <br />C 2.13 Public Services and Utilities <br /> Natural Gas <br />K Project Impacts <br /> The project would consume approximately 86,210,000 cubic feet <br />K of natural gas per month. The project would not have a significant <br /> impact on Southern California Gas Company's ability to provide gas <br />.3 <br />Li service to the project. <br /> Mitigation Measures <br />LI <br /> No mitigation measures are proposed other than the energy <br /> conservation measures discussed in Section 5.14 (Energy) of this report. <br /> Electricity <br /> Project Impacts <br /> The project would consume approximately 13,054,240 Kwh of <br /> electricity per month. The project would be served by existing <br /> 13
The URL can be used to link to this page
Your browser does not support the video tag.