Laserfiche WebLink
±1 <br /> facilities located in the area and the electric loads of the project are <br /> * within parameters of projected load growth which Edison is planning to <br /> meet in this area. <br /> Mitigation Measures <br /> No mitigation measures are proposed other than the energy <br /> conservation measures discussed in Section 5.14 (Energy) of this report. <br /> Telephone <br /> I r. Project Impacts <br /> Although the project would be served from existing facilities, <br /> reinforcement of the existing telephone network would be necessary. The <br /> degree of reinforcement would vary from new cables being pulled through <br /> * It <br /> existing conduit systems to the installation of new conduit and cable <br /> systems. <br /> I.- <br /> I. <br /> Mitigation Measures <br /> 15. <br /> No mitigation measures are proposed. <br /> * ii. <br /> Water <br /> ______________________ <br /> Project Impacts <br /> The proposed project is estimated to consume approximately <br /> 490,000 gallons of water per day. The project would be served by <br /> existing water mains in the area, however, someimprovements to the <br /> system may be required at the time of development in accordance with the <br /> City's standard building permit approval process. <br /> Mitigation Measures <br /> No mitigation measures are proposed. <br /> 1 14