My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
05-13-19
>
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:50:43 PM
Creation date
8/16/2019 4:46:03 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
598
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
±1 <br /> facilities located in the area and the electric loads of the project are <br /> * within parameters of projected load growth which Edison is planning to <br /> meet in this area. <br /> Mitigation Measures <br /> No mitigation measures are proposed other than the energy <br /> conservation measures discussed in Section 5.14 (Energy) of this report. <br /> Telephone <br /> I r. Project Impacts <br /> Although the project would be served from existing facilities, <br /> reinforcement of the existing telephone network would be necessary. The <br /> degree of reinforcement would vary from new cables being pulled through <br /> * It <br /> existing conduit systems to the installation of new conduit and cable <br /> systems. <br /> I.- <br /> I. <br /> Mitigation Measures <br /> 15. <br /> No mitigation measures are proposed. <br /> * ii. <br /> Water <br /> ______________________ <br /> Project Impacts <br /> The proposed project is estimated to consume approximately <br /> 490,000 gallons of water per day. The project would be served by <br /> existing water mains in the area, however, someimprovements to the <br /> system may be required at the time of development in accordance with the <br /> City's standard building permit approval process. <br /> Mitigation Measures <br /> No mitigation measures are proposed. <br /> 1 14
The URL can be used to link to this page
Your browser does not support the video tag.